Laserfiche WebLink
<br />-' ' <br /> <br />J,( ~~,~d <br /> <br />/ <br /> <br />'Plan 5 <br /> <br />SUMMARY SHEETS (Continued) <br /> <br />ESTIMATED COSTS <br /> <br />Construction costs (October 1972 prices) <br />Interest durinS construction . <br />Annual operation, maintenance, and replacement <br />costs (1968-70 prices) . . . . . . . . . . . <br /> <br />. . . <br /> <br />BENEFIT-COST ANALYSIS (lOO-year period of analysis) <br /> <br />Average annual benefits <br />Industrial, municipal, snd domestic use <br />Irrigation <br />Recreation <br />Fish and wildlife <br />ilood con trol <br />Total <br />Less benefits lost in reservoir basins <br />Net benefits . . . . . . . . . . . <br />Average , annual equivalent cost~ (5 1/2, percent interest <br />Be~efit-cost ratio . . . . . . . . . . . . . . . . . . . <br /> <br />'. <br /> <br />. <br /> <br />. <br /> <br />2 <br /> <br />$65,361,000 <br />7,101. ,000 <br /> <br />550,000 <br /> <br />$4,87/, ,500 <br />612,900 <br />245,800 <br />137,700 <br />11 ,000 <br />5,881,900 <br />9,900 <br />5,872 ,000 <br />4,671,600 <br />1. 26: 1 <br />