Laserfiche WebLink
<br />. <br /> <br />C\! <br /><.0 <br />o <br />C\l <br /> <br />March 1973 <br /> <br />SUMMARY SHEET <br /> <br />YELLOW JACKET PROJECT, COLORADO <br /> <br />LOCATION <br /> <br />The Yellow Jacket Project is located in northwestern Colorado in the <br />White and Yampa River Basins of the Upper Colorado River Basin. <br /> <br />CURRENT STATUS <br /> <br />The project was given priority in the completion of its planning report <br />as a potential participating project in the April 11, 1956 Colorado River <br />Storage Project Act (P.L. 485). The initial Proposed Regional Director's <br />Report was comple ted in October 1968 and distributed for review'. This <br />report included recommendations by the Bureau of Sport Fisheries and <br />Wildlife that project reimbursable funds be spent to purchase 14,000 <br />acres of privately owned lands for the mitigation of deer losses caused <br />by project irrigation of privately owned lands. The Yellow Jacket Water <br />Conservancy District raised objections to this recommendation. After <br />numerous meetings with all interested parties the plan was rescoped to: <br />eliminate project irrigation served to all lands not presently cultivated; <br />provide greater fishery releases in the White River; provide mitigation <br />costs of $500,000 as a portion of the project costs; and to provide <br />additional water for municipal, domestic, and industrial use. <br /> <br />Because the present project plan has been revised from the 1968 report, <br />the report was again distributed for review in August 1972. The Draft <br />Enviornmental Statement was also completed and distributed for review <br />with the report. <br /> <br />The Colorado Wildlife Commission has now gone on record as opposed to <br />the project in any form or any similar project on the White River upstream <br />from Meeker, Colorado. They further moved that if the project is con- <br />structed that certain additional mitigation measures be included in the <br />project, some of which were included in the revised plan. <br /> <br />An attempt is underway again, through the evaluation of alternatives, <br />to meet the requirements of all concerned parties. <br /> <br />Funding <br />Genral investigations <br />Contributed funds <br />Total <br /> <br />$596,254 <br />5,669 <br />$601,923 <br />