Laserfiche WebLink
<br />001795 <br /> <br />October 3. On October 7, the study team traveled to Alamosa to meet <br />with Alamosa City and County officials and to see the river and levee <br />system first-hand. Measurements, notes and photos were made of <br />critical areas along the levee. <br /> <br />Photo base maps were prepared by the CWCB and the hydraul i c computer <br />model for this reach of the river system was made available by the COE <br />On October 17, surveyed cross sections of the river channel were <br />completed and made available to MEC by Alamosa County. On October 21, <br />the preliminary findings of the reconnaissance study were reviewed <br />with all involved entities, meeting at the MEC office in Lakewood. <br />Agencies included in that meeting included the City of Alamosa, <br />Alamosa County, CWCB, Division of Disaster Emergency Services, COE and <br />Department of Local Affairs. <br /> <br />Acknowledgments <br /> <br />The assistance and cooperation of the below listed agencies, firms and <br />organizations, in addition to numerous private citizens, in supplying <br />useful information and data are appreciated and gratefully <br />acknowl edged. <br /> <br />Ci ty of A 1 amosa <br />Board of County Commissioners, Alamosa County <br />Colorado Water Conservation Board <br />U.S. Army Corps of Engineers, Albuquerque District, <br />Albuquerque Office and Pueblo Area Office <br />Colorado Division of Disaster Emergency Services <br />Colorado Department of Local Affairs <br />Rio Grande Water Conservancy District <br />West Side Irrigation Company <br />Division Office, State Engineer <br />San Luis Water Conservancy District <br />Federal Emergency Management Agency <br />Cou nty Su rveyor <br /> <br />The aeri a 1 photo base maps were provi ded by the CWCB and prepared by <br />Kucera Aerial Mapping of Denver. <br /> <br />-3- <br />