My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05285
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:41 PM
Creation date
10/12/2006 12:57:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.A
Description
Colorado River Threatened-Endangered - UCRBRIP - Program Organization-Mission - Workplans
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/2001
Author
DOI-FWS
Title
Fiscal Years 2002-2003 Work Plan - Recovery Implementation Program for Endangered Fish Species in the Upper Colorado River Basin - 09-01-01
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,.104.; :'"..." <br /> <br />000581 <br /> <br />1. BACKGROUND AND FY 2002-2003 BUDGETS <br /> <br />A primary responsibility of the Colorado River Recovery Implementation Committee is to <br />develop and recommend priorities for the use of funds under the Recovery Program. Beginning <br />in FY 2002, the Program adopted a 2-year work planning process, so this work plan covers both <br />FY 2002 and FY 2003. <br /> <br />FY 2002 <br /> <br />The Recovery Program's maximum annual budget in FY 2002 is $5,547,500 and the capital <br />budget is $10,879,000. Additional funding expected from additional agency contributions and <br />Section 7 funds brings the FY 2002 maximum total budget to $ I 6,866, I 00. The budget tables <br />beginning on page A-I outline how these funds will be spent. <br /> <br />AGENCY ANNUAL CONTRIBUTIONS: <br />Bureau of Reclamation (maximum Dower revenues) $4,136,000 <br />Fish and Wildlife Service (requested) $1,106,400 <br />:olorado $158,500 <br />Utah $111,300 <br />Wyomin9 $35,300 <br />ANNUAUO&M TOTAL: $5,547,500 <br />AGENCY CAPITAL CONTRIBUTIONS: <br />Reclamation $4,432,000 <br />Power Revenues $4,136,000 <br />Colorado $1,400,000 <br />Utah $610,000 <br />WvominQ $301,000 <br />CAPITAL TOTAL: $10,879,000 <br />Water User Section 7 Funds $63,500 <br />Additional agency contributions $396,100 <br /> <br />FY 2003 <br /> <br />The Program's FY 2003 budget will be similar to FY 2002 with increases for inflation which <br />will be calculated in January 2002. The budgel table beginning on page B-1 outlines the <br />tentative FY 03 budget. <br /> <br />2. WORK PLAN DEVELOPMENT PROCESS <br /> <br />Tables I and 2 on the following pages outline the schedule for developing and implementing the <br />Recovery Program's biennial work plans. Projects in these work plans are designed to <br />implement the priority recovery actions identified in the Recovery Implementation Program <br />Recovery Action Plan (RIPRAP). The RIPRAP is the operational plan for implementing the <br />Recovery Program that identifies the actions necessary to recover the endangered fishes in the <br />Upper Basin. <br />
The URL can be used to link to this page
Your browser does not support the video tag.