My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05285
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:41 PM
Creation date
10/12/2006 12:57:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.A
Description
Colorado River Threatened-Endangered - UCRBRIP - Program Organization-Mission - Workplans
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/2001
Author
DOI-FWS
Title
Fiscal Years 2002-2003 Work Plan - Recovery Implementation Program for Endangered Fish Species in the Upper Colorado River Basin - 09-01-01
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />000601 <br /> <br />--------- APPENDIX C: FY-2002 - 2003 PROJECT DESCRIPTIONS <br /> <br />C-II CAP/9302: Grand Valley Water Management (BR, $423,800) <br /> <br />Modification, automation, and improvement of the Government Highline canal system to <br />improve canal system efficiency and increase flows to the IS-mile reach through the <br />Grand Valley Water User's Association (GVWUA) power plant. The automation system <br />(SCADA) will be constructed in FY 2002 and the Highline Lake pumping plant will be <br />constructed in FY 2003. Total out year cost: $1,427,800. <br /> <br />C-14 CAP/9403: Coordinated Reservoir Operations (CWCB, $0) (See PIP-12c) <br /> <br />94/C-24 CAP/9801: Duchesne River Coordinated Reservoir Operations (BR, $10,000) <br /> <br />Completion of identification and evaluation of opportunities to coordinate operations of <br />various reservoirs in the Duchesne River Basin with the goal of delivering water to the <br />lower Duchesne River to improve important habitat for Colorado pikeminnow and <br />razorback sucker. Total out year cost: $0 <br /> <br />84. HMG/970 I: Duchesne River Biological Studies (FWS, UDWR $0) <br /> <br />Completion of report providing biological (fish distribution and relative abundance) and <br />physical-habitat (channel morphology and maintenance) data for testing and/or <br />refinement of the existing preliminary flow recommendations for the Duchesne River to <br />facilitate recovery of the endangered fishes. Total out year cost: $0. <br /> <br />85. HMG/90--: Basinwide Channel and Sediment Monitoring <br /> <br />The channel monitoring program supports Recovery Program efforts to develop flow <br />recommendations, restore flooded bottomlands, and monitor the physical conditions of <br />the rivers in lhe Upper Colorado River Basin. <br /> <br />8Sa. Mainstem Colorado (FWS, CU $0) - Completion of report on sediment transport and <br />channel dynamics in the 15- and 18-mile reaches of the upper Colorado River and the <br />geomorphic effects of coordinated reservoir releases. Total outyear cost: $0. <br /> <br />8Sb. Yampa and Green River sediment monitoring (FWS, USGS $71,000) - Standardized <br />monitoring of sediment load (suspended and bed) and bed material in the Yampa and <br />Green Rivers to determine effects of flows and help define habitat requirements. Total <br />out year cost: $71,000. <br /> <br />8Sc. Upper Colorado River Channel Monitoring (FWS, $19,800) - Monitoring depth-to- <br />embeddedness and invertebrate biomass at each of 16 sites along the Colorado River in <br />the Grand Valley. Total out year cost: $147,700. <br /> <br />C-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.