My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05285
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:41 PM
Creation date
10/12/2006 12:57:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.A
Description
Colorado River Threatened-Endangered - UCRBRIP - Program Organization-Mission - Workplans
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/2001
Author
DOI-FWS
Title
Fiscal Years 2002-2003 Work Plan - Recovery Implementation Program for Endangered Fish Species in the Upper Colorado River Basin - 09-01-01
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PROJECT <br />NUMBER <br /> <br />TECH,' <br />COMM, <br /> <br />'PROJECT <br />TITLE <br /> <br />FY 200i <br />TOTAL <br /> <br />FY 2002 FY 2002 FY 2002 FY 2002 FY 2002 <br />ANN. FUNDS CAP. FUNDS O&M FUNDS SEC. 7 FUNDS OTHER FUNDS <br /> <br />:' FY 2002" <br />COMMENTS <br /> <br />II. Habitat Restoration <br />C-4b BC Redlands Fish Passage Oper, $26.400 $26,400 <br />C-5 BC Pnce-Slubb Fish Passage $30,000 $30,000 <br /> Grand Valley Project Fish Passage <br />C-23 BC & Screen $3,230,000 $3,230,000 <br />C-28 BC Tusher Wash diversion screen $3,000 $3,000 <br />C-29 BC GVIC fish screens $1,900,000 $1,900,000 <br /> No SOW. Deferred for one year. Waiting for <br /> temperature model results 12/01. Be needs to discuss <br />C-26 BC Hartland passage & screen $0 when Hydroshpere's report is completed, <br />116 BC Redlands screen $0 <br />C-6 BC Floodplain Restoration Program <br />UMB BC Contaminants site screening $20,000 $20,000 <br />HYD BC Hydrology/geomorphology $95,700 $95,700 <br /> Evaluation of middle Green River <br />BT BC floodplains for bonytail restoration $67,000 $67,000 <br />LAND BC Land acquisition $748,000 $748,000 <br />EASEMENT BC Easement & weeds mgmt. $67,000 $55,000 $12,000 <br />UMB BC Levee removal construction $423,800 $423,800 <br />LARVAL BC Larval drift/entrainment eval, $15,000 $15,000 <br /> Evaluation of larval RBS slocked <br />RZ , BC into Middle Green R, depressions $58,000 $58,000 <br /> This is a plan to integrate endangered fish management <br /> into Stewart lake, which is currently managed for <br /> waterfowl, SOW and S not needed -- UDWR and <br /> USFWS~ES to meet within the next few months and <br />117 BC Stewart lake management plan wori< out a plan. <br /> <br />Q <br />Q <br />Q <br />-en <br />tQ <br />o <br /> <br />Appendix A: Recovery Program FY 2002 Budget Summary <br /> <br />Page A-2 <br /> <br />01111/2002 11 :03 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.