Laserfiche WebLink
<br />o <br />c <br /> <br />;;- <br /> <br />.... <br /> <br />It:. . <br /> <br />PERSONNEL <br /> <br />The initial work on this project was directed by <br /> <br />Engineer F. .C. Merriell, who vas succeeded by Associate <br /> <br />Engineer A. F. ~ohnson. WI. ~ohnson also prepared the <br /> <br />detailed tentative report on which this report is largely <br /> <br />based. <br /> <br />The state Line and Red Mesa dam sites were mapped by <br /> <br />forces under Construction Engineer C. A.. Burns of the Pine <br /> <br />River Project. <br /> <br />Geological investigations were conducted by Associate <br /> <br />Engineer M. Merriman. <br /> <br />Field surveys were completed and economic data compiled <br /> <br />by Assistant Engineer ~. J. Hedderman. <br /> <br />The lands were classified and mapped under the direction <br /> <br />of Associate Engineer H. F. Bahmeier and Associate Reclamation <br /> <br />Economist E. R. Fogarty. <br /> <br />Water supply studies were made by Junior Engineers N.-L. <br /> <br />Lucas and E. R. Anesi and Assistant Engineer Leon F. Maca <br /> <br />in the Denver Office. <br /> <br />Preliminary plans and cast estimates for reservoirs were <br /> <br />prepared under the direction of Senior Engineer-W. L. <br /> <br />Blomgren. This report has been prepared by Engineer S. A. Kerr. <br /> <br />All of the activities have been supervised by Hydraulic <br /> <br />Engineer E; B. Debler. <br />