My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05278
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:39 PM
Creation date
10/12/2006 12:56:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa River General
State
CO
Basin
Yampa/White
Water Division
6
Date
7/31/1990
Author
Hydrosphere
Title
Yampa River Basin - Alternatives Feasibility Study - Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />OO~5B2 <br /> <br />Plan of Study <br /> <br />14 <br /> <br />m. DETAILED WORK PIAN <br /> <br />GENERAL <br /> <br />This section of the Plan of Study contains detailed descriptions of tasks and sub-tasks. Task <br />descriptions contain a general overview of task objectives, an outline of sub-tasks, and <br />identification of task leaders and key support professionals. Sub-task descriptions contain a <br />statement of the purpose of the sub-task, the technical approach to be followed in executing <br />the sub-task, and a brief definition of the work products that will result from the sub-task. <br />Throughout the task and sub-task descriptions, an attempt has been made to relate the work <br />to preceding and subsequent tasks and sub-tasks. <br /> <br />The tasks to be undertaken in the study are listed below. <br /> <br />Task No. <br /> <br />Task Name <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br /> <br />Study Coordination Activities <br />Review Water Demands <br />Reservoir Site Identification and Preliminary Screening <br />Hydrology and Water Rights <br />Reservoir Site Evaluation <br />Project Formulation <br />Evaluation of A1tetuatives <br />Review and Screening of Alternatives <br />Final Evaluation and Selection of Recommended Project <br />Project Development Plan <br />Final Report <br /> <br />~: <br />
The URL can be used to link to this page
Your browser does not support the video tag.