Laserfiche WebLink
<br />r"1871 <br />. <br /> <br />. <br /> <br />Elimination of irrigation benefits by reducing the reser- <br /> <br /> <br />voix' capacity by 5200 acre-feet would not materially change the <br /> <br /> <br />ratio of' flood control expenditure to total project cost as noted <br /> <br /> <br />above since the irrigation capacity is secured at little added <br /> <br /> <br />cost. Participation by irrigators, in costs of' other reservoirs <br /> <br /> <br />such as for Long's Canyon reservoir, would not exceed $456,000 under <br /> <br /> <br />a repayment plan as set forth herein. With limited canal capacity <br /> <br /> <br />for the Long's Canyon storage plml (1500 second-feet) conserved <br /> <br /> <br />waters would be less than shown herein. <br /> <br /> <br />It is advisable to bring out here that these studies, as <br /> <br /> <br />well as reconnaissance surveys, point tc no other possibility of <br /> <br /> <br />combined irrigation and flood control projects in this area for <br /> <br /> <br />which total bonefits would be more favorable. <br /> <br />. <br /> <br />84 <br /> <br />