My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05255
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:33 PM
Creation date
10/12/2006 12:56:05 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
5/1/1980
Author
MRBC
Title
Missouri River Basin Water Resources Management Plan - Part II - Chapters VII-Appendix F
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />21-KANSAS AND OSAGE RIVERS, KANSAS STUDY <br />Army Corps of Engineers <br />Flooding, Land Conservation & Management <br /> <br />Ongoing special study thru FY B3; streambank <br />stab. on KS River & tribs, mineral pollution con- <br />trol in KS River Basin & additional water supply <br />& distrib. in KS & Osage; study cost $4.5 million. <br /> <br />o <br />'C <br />~l:D <br />\~ <br />.'-<D <br />....... <br /> <br />..................................................................................................................... <br /> <br />22-A&T LONG BRANCH WATERSHED PROJECT, IOWA <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation & Management <br /> <br />Watershed in Adams & Taylor counties; recommended <br />for planning; project envisions 25 grade stabili- <br />zation structures; cost $2 million. <br /> <br />.................................................................................................................... <br /> <br />23-ALLEN-STEER CREEK WATERSHED PROJECT, IOWA <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation & Management <br /> <br />Watershed in Harrison & W. pottawattamie counties; <br />recommend for planning; project envisions 21 grade <br />stabilization structures; cost $9.8 million. <br /> <br />................................................................................................................... <br /> <br />24-CBS WATERSHED PROJECT, IOWA <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation & Management <br /> <br />Watershed in Page County; recommended for <br />planning; project envisions 40 grade <br />stabilization structures; cost $5.5 million. <br /> <br />................................................................................................................... <br /> <br />'" <br />1 <br />,.. <br />en <br /> <br />25-CUBB CREEK WATERSHED PROJECT, IOWA <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation & Management <br /> <br />Watershed in Harrison County; recommended for <br />planning; project envisions B grade stabilization <br />structures; cost $500,000. <br /> <br />................................................................................................................... <br /> <br />26-EAST 102 RIVER WATERSHED PROJECT, IOWA, MISSOURI <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation & Management <br /> <br />Watershed in Taylor County; recommended for <br />planning; project envisions 5 flood detention <br />structures; cost $2.7 million. <br /> <br />................................................................................................................... <br /> <br />27-ELK CREEK WATERSHED PROJECT, IOWA <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation & Management <br /> <br />Watershed in Harrison & Manana counties; recom- <br />mended for planning; project envisions 40 grade <br />stabilization structures; cost $2.4 million. <br /> <br />................................................................................................................... <br /> <br />28-JAMES CREEK WATERSHED PROJECT, IOWA <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation & Management <br /> <br />Watershed in Plymouth & Woodbury counties; <br />recommended for planning; project envisions 12 <br />grade stabilization structures; cost $600,000. <br /> <br />................................................................................................................... <br />
The URL can be used to link to this page
Your browser does not support the video tag.