My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05255
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:33 PM
Creation date
10/12/2006 12:56:05 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
5/1/1980
Author
MRBC
Title
Missouri River Basin Water Resources Management Plan - Part II - Chapters VII-Appendix F
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7-S0UTIlEASTERN WYOMING RC&D PROJECT, WYOMING <br />USDA/Soil COnservation Service <br />Comprehensive <br /> <br />Ongoing project in Laramie, Platte, Goshen, and <br />and Converse counties; funding requirements are <br />$51,000 for FY 80; $100,000 for FY 81-82. <br /> <br />.................................................................................................................... <br /> <br />8-NEBRASKA RIVER BASINS SPECIAL STUDIES <br />USDA/Soil Conservation Service <br />Comprehensive <br />Also in W. Dakotas, E. Dakotas, & Middle Mo. Subbasins_ <br /> <br />Ongoing special studies of erosion, sediment, <br />rural water, & flooding in Mo. tribs & White-Hat <br />basins; prime farmland mapping in Platte critical <br />habitat areas. COst is $1.3 million; FY 79-84. <br /> <br />..................................................................................................................... <br /> <br />9-SNOW SURVEYS <br />USDA/soil Conservation Service <br />Comprehensive <br />Also in Upper Missouri and Yellowstone Subbasins <br /> <br />Ongoing program of manual and remote measurement of <br />hydrometeorological snow survey data stations in <br />mountain snow courses in WY, CO, and Ml'; total <br />FY 81 funding requirement for MRB is $328,000. <br /> <br />................................................................................................................... <br /> <br />10-DESIGN AND CONSTRUCTION PROGRAM, DENVER, COLORADO <br />Urban Drainage and Flood Control District <br />Flooding <br /> <br />" <br />I <br />~ <br />N <br /> <br />FLOODING <br /> <br />Ongoing design and construction of flood control <br />measures for Denver metro area; local governments <br />are cooperating agencies; annual joint expendi- <br />tures are approx. $4 million through FY 82. <br /> <br />................................................................................................................... <br /> <br />ll-FLOOD HAZARD AREA DELINEATION PROGRlIM, DENVER, COLORADO <br />Urban Drainage and Flood Control District <br />Flooding <br /> <br />Ongoing studies to define 100-year flood plain for <br />further management by local entities; Colo. WCB & <br />local gov'ts contribute; annual requirements are <br />$95,000 through FY 82. <br /> <br />................................................................................................................... <br /> <br />12-MASTER PLANNING PROGRlIM' DENVER, COLORADO <br />Urban Drainage and Flood Control District <br />Flooding <br /> <br />Ongoing studies on major drainageways in Denver <br />area to define flood plain, estimate anticipated <br />damages, evaluate alternatives, & select flood con- <br />trol designs; annual costs are $235,000 thru FY 82. <br /> <br />..............................................................~.................................................... <br /> <br />13-DOWNSTREAM CHANNEL IMPROVEMENT AT CHATFIELD DAM, COLORADO <br />Army Corps of Engineers <br />Flooding, Recreation <br /> <br />Proposed new start implementation of flood control <br />and erosion contr,ol measures on the S. Platte River <br />channel from Chatfield Dam down to Denver; <br />schedule is not yet determined; cost $9.9 million. <br /> <br />.................................. .... .............. .......... ............ ~........ ....................... ......... <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.