My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05254
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:33 PM
Creation date
10/12/2006 12:56:04 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
7/27/1938
Author
LA Water & Power
Title
Boulder Canyon Project: Estimated Comparative Financial Results Based on Bureau of Reclamation 1936 Estimates of Investment Sales and Expenses
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />en <br />00 <br />.... <br />N <br /> <br />BOULDER CANYON PROJECT <br /> <br />c <br /> <br /> <br />ect Act <br /> <br />ftA" . <br />(Under Present <br />Boulder Canyon <br />Project Act) <br /> <br />"B" ** <br />(Under <br />Proposed <br />Le/l:islation) <br /> <br />1. Rate for "firm" falling water which may <br />reasonably be expected in 1945 and <br />thereafter on basis Of rate-fixing <br />conditions. (Under "A", competitive <br />conditions; under liB", financial re- <br />quirements) <br /> <br />1. 00 mill <br /> <br />1.00 mill <br /> <br />2. 1 mill rate (under "A", in 1945; under <br />"B" immediately): <br /> <br />(a) Date when money becomes first <br />available in "seJ8rate rum" <br /> <br />Never <br /> <br />Immediately <br /> <br />(b) Accur:lUlation for "separate fund" <br />within 50-year period <br /> <br />Defici t <br />$75,200,000 <br /> <br />tH,J.bU,UUU <br />I~ ,,"o,O"GO <br />I <br /> <br />~. Rate after 1945 necessary to caver re- <br />payment to Government in the 50 years, <br />with nothing for the "separate fund" <br /> <br />1.3 mills <br /> <br />0.8 mills <br /> <br />*Interest rate on total investment,4%; flood control allocation <br />of $25,000,000 emortized out of 62-1/2% of surplus revenues; <br />payments to each of States of Arizona and Nevada of 18-3/4% <br />of alrplus revenues; rate for falling water for generation <br />of firm energy adjusted in 1945 to one mill per kilowatt- <br />hour, end cont inuing thereafter, in accordanc e with assumed <br />competitive conditions. <br /> <br />**Interest rate on power allocation, 3-1/2%, except apprOximately <br />actual money cost during construction; adVances repaid over <br />period Of fifty years, except flood control allocation of <br />$25,000,000 repaid without interest after 1987; payments of <br />$300,000 per year to each of States of Arizona and Nevada; <br />payments of $400,000 per year into "separate fund", except <br />modified dUring absorption period; rates for falling water <br />fixed to provide financial requireoents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.