My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05238
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:29 PM
Creation date
10/12/2006 12:55:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8509
Description
San Luis Valley
State
CO
Basin
Rio Grande
Water Division
3
Date
2/26/1935
Title
Report of San Luis Valley Drain Committee to Administrator Harold L. Ickes
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />... - "--'""--"'~''"'''':'_o'';:'''''_,: "i<,:j.;'.o'-'_ ., ,.. ~o V <br /> <br />co <br />(:'J <br />,-.: <br />~,t ~6mmnn excavation. A part of the excavation will be i~ conBolidat~ <br /> <br />I..,.~'" <br />(~; ed sediments, insufficiently hardened to be called rock, but mcre <br /> <br />Gxpensive to be removed than common excavation. Materiel of this <br /> <br />kind is being removed under Bureau contract at a cost of 15 to 30 <br /> <br />cents por cubic yurd. In the absence of field dnta on e~cavntion <br /> <br />~. <br /> <br />conditions, it is estimated that 10 per cent of the excavr,tion fol" <br /> <br />the Storm Chunnel and 20 per cent 0f the excavati on for the Main <br /> <br />l <br />({ <br /> <br />Drain will be in material of this character, for which a contract <br /> <br />price of 25 cents per cu. yd. has boen adopted. <br /> <br />l <br />~ <br /> <br />For bridges, fencing and ~ther appurtennnt structures, <br /> <br />estill'.n.tes ho.ve been mo.de on a lump sum basis for each mjor struc- <br /> <br />ture and for eaoh class of minor structures, without the benefit <br /> <br />~ <br />je' <br /> <br />of deteil designs. <br /> <br />The eirc.ins, berms, spoil ba.nks, intercepting ditches and <br /> <br />fonces, will require a right of vmy of a ~~dth of 100 to 200 feet. <br /> <br />t <br /> <br />For estimating pUrposes~ considering the needs for maintenance, n <br /> <br />width of 400 feet has been a.ssumed desirable. Considering that a <br /> <br />mnterial pnrt of the lc.nds traversed by th~ drain are owned by th~ <br /> <br />United States, State and Counties, end will become availa.ble at a <br /> <br />nominel cost, the total cost of right of ways are estinnted et <br /> <br />$24,000. This item, however, does nAt include the cest ~f securing <br /> <br />"f WD.ivers of damuges by reason of c. depressed wr.ter table that my <br /> <br />result from th~ construction of' the Main Drain, the effect of which <br /> <br />may bA felt for several miles on either side of tho drain, excopt on <br /> <br />the river bottom south of tho D. & R. G. Railway Wlero the effect <br /> <br />15 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.