<br />~
<br />
<br />~
<br />
<br />\
<br />.
<br />,
<br />
<br />r
<br />I
<br />
<br />)
<br />
<br />.
<br />
<br />Comperlson of BOR Recommended Qperotlons Plen deted February 1, 1984 Forecest
<br />wIth the status Report for February, 1984
<br />
<br />L
<br />E
<br />V
<br />E
<br />L
<br />
<br /> Fleming 81ue Morrow Toted Totel Flood
<br /> Fontanel I e Gorge Mese Point Crystel NavaJ 0 Powell CRSP Meed Control Space
<br />Anticipated February 29, 1984 6482.07 6025.16 7461.76 7159.72 6753.04 6060.38 3677.02 1207.70
<br />operating level from February -
<br />1.
<br />1984 Forcast plen. (FT.)
<br />Adopted 11/18/83 Upper Quartile 6482.07 6025.64 7472.79 7159.72 6753.04 6064.19 3676.99 1212.24
<br /> -
<br />Plan Reservoir level on 2/29/84
<br />(FT.)
<br />Actual 2/29/84 Reservoir level 6479.21 6024.83 7460.62 7157.22 6746.21 6060.66 3677.02 1207.67
<br /> -
<br />(FT.)
<br />Top LI ve Storage if Capac I ty (FT.) 6506 .00 6040.00 7519.40 7160.00 6755.00 6085.00 3700.00 1229.00
<br /> -
<br />Max. Live Storage Capactly (e. f.) 344.834 3,749,'350 829,523 117.025 17.573 ',696,400 25,002,000 31,756,905 27.377.000
<br />In Live Storage on 2/29/84 (a. f.) 161,900 3.150.900 374.600 114.800 15.650 1,352.300 21.478.000 26.648.150 24,045.000
<br />Feb 1. Forecast ProJ ected Live 178.000 3,163,000 382,000 117.000 17,000 1,348,000 21,479,000 26.684,000 24,053,000
<br />Storage on 2/29/84 (a. f.)
<br />February 29, 1984/Dlf1erence Pro- -16.100 -12,100 -7,400 -2,200 -1.350 +4300 -1,000 -35,850 -B,OOO
<br />Jected & Actual Storage (a. f.)
<br />Available LIve Storage (a.f.) 182,934 598,650 454,923 2,225 1923 344.100 3,524,000 4,937,773 3,332,000 8,269,773
<br />Creditable FC Storage LimIt (a.f.) NONE 1,570,200 748,500 NONE NONE 1,035,900 3.850,000 7,141,600 NOtE NOtE
<br />Required Fe Storage (a.f.) NONE NONE NONE NONE NONE NONE NONE 1,500,000
<br />
<br />I
<br />I
<br />
<br />.
<br />
<br />S
<br />T
<br />o
<br />R
<br />A
<br />G
<br />E
<br />
<br />.
<br />
<br />Notes: 1)
<br />
<br />701/ crso/8
<br />
|