My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05214
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:25 PM
Creation date
10/12/2006 12:54:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.700
Description
Fryingpan-Arkansas Project - Annual Operating Plans and Reports
State
CO
Basin
Arkansas
Water Division
5
Date
11/1/1989
Author
US DoI BoR
Title
Annual Operating Plan Fryingpan-Arkansas Project Colorado 1989 - 1990
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />...0 <br />'lS I ~l <br /> <br />May 24, 1985 <br />July 1, 1985 <br />August 1985 <br />November 27, 1985 <br />May 7, 1986 <br />June 1986 <br />November 10, 1987 <br />November 17, 1989 <br /> <br />Began storing water ynder Arkansas River Decree <br />Initial diversion through Fountain Valley Conduit <br />Ruedi Hydroplant begdn operations <br />Twin Lakes pipeline began operations <br />Sugar Loaf Hydroplant began operations <br />Imports restricted d~e to high East Slope storage <br />Winter water storage idecree approved and signed <br />Completed the removal: of dikes and constructed the <br />bypass channel aro~nd the old outlet works in the <br />old Twin Lakes dam! <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.