My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05210
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:24 PM
Creation date
10/12/2006 12:54:17 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8543
Description
Closed Basin Division
State
CO
Basin
Rio Grande
Water Division
3
Date
4/22/1985
Title
Agenda Item 15 - May 1985 - Board Meeting -- Closed Basin Project - Stage 5 Wells
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,....j <br />:.-....... <br />,:J <br />....-l <br />~:) <br />(;:J <br /> <br />COLORADO WATER CONSERVATION BOARD <br />721 STATE CENTENNIAL BUILDING <br />1313 SHERMAN STREET <br />DENVER, CO B0203 <br /> <br />May 3, 1985 <br /> <br />RES 0 L UTI 0 N <br /> <br />WHEREAS, Public Law 92-514, as amended by Public Law 96-375, <br />authorizes the Secretary of the Interior, hereinafter referred to <br />as the IISecretarYJ II to cons'truct, operate, and maintain the <br />Closed Basin Division, San Luis Valley Project, Colorado, herein- <br />after referred to as the "project"; and <br /> <br />WHEREAS, Section lOl(b) of said public law provides that: <br />"Construction of the project may be undertaken in such units or <br />stages as in the determination of the Secretary will best serve <br />project requirements and meet water needs: Provided, that <br />construction of each of the successive units or stages after <br />stage 1 of said project shall be undertaken only with the consent <br />of the Colorado Water Conservation Board and the Rio Grande Water <br />Conservation District.. ."; and <br /> <br />WHEREAS, the Secretary, acting through the U.S. Bureau of <br />Reclamation, desires to initiate the drilling of salvage wells <br />and the acquisition of land needed for such wells in stage 5 of <br />the project in federal fiscal year 1986 in order that such wells <br />might be pump tested so that data can be obtained for the subse- <br />quent design of pumps and distribution pipes; and <br /> <br />WHEREAS, all such wells will be capped after test pumping <br />and not placed into production until the Colorado Water Conserva- <br />tion Board and the Rio Grande Water Conservation District consent <br />to the same. <br /> <br />NOW THEREFORE, BE IT RESOLVED by the Colorado Water <br />Conservation Board in regular session assembled at Denver, <br />Colorado, this 3rd day of ~Iay, 1985, that the Board does hereby <br />consent to the drilling of salvage wells and the acquisition of <br />the land needed for such wells in stage 5 of the project so long <br />as: (1) all such wells are capped after being pumped tested and <br />not put into production until the consent of the Colorado Water <br />Conservation Board and the Rio Grande Water Conservation District <br />has been given to place such wells in production, (2) the project <br />proceeds in substantial conformity with the Definite Plan Report <br />for said project, (3) the U.S. Bureau of Reclamation proceeds <br />with diligence in the construction of stages 1-2, 3, and 4 of the <br />project, and (4) construction of such wells is in compliance with <br />applicable state law. <br /> <br />713 <br />res/jul <br />
The URL can be used to link to this page
Your browser does not support the video tag.