My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05166
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:14 PM
Creation date
10/12/2006 12:53:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Water Division
2
Date
9/1/1959
Title
Ruedi Dam and Reservoir Colorado Supplementing House Document No 187 83rd Congress 1st Session Report on the Fryingpan-Arkansas Project Colorado with related documents and revision material
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />t" ,;"1 .,,~ ,""j <br />':1.).) ;j: <br /> <br />Month <br /> <br />Average <br />Second-feet <br /> <br />October <br />November <br />December <br />January <br />February <br />March <br />April <br />May <br />June. <br />July. <br />August <br />September <br /> <br />44 <br />35 <br />29 <br />26 <br />25 <br />24 <br />64 <br />100 <br />120 <br />100 <br />63 <br />44 <br /> <br />Acre~feet <br />J.l,OOO ) <br /> <br />2.7 <br />2.1 <br />1.8 <br />1.6 <br />1.4 <br />1.5 <br />3.8 <br />6.2 <br />7.1 <br />6.2 <br />3.9 <br />2.6 <br /> <br />40.9 <br /> <br />Total <br /> <br />. . . <br /> <br />. <br /> <br />In maintaining the above averages, at no time shall the flow be <br />reduced below 15 c.f.s. during the months of August to A.pril, inclu~ <br />sive, or below 60 c.f.s. during the months of May to JUlY, inclusive, <br />providing the natural flow during said period is not less than these <br />amounts. The obligation to supply the minimum stream flow as set <br />forth in the above table on the Roaring Fork River shall, to the <br />extent of 3,000 acre-feet annually, be a project obligation to be <br />supplied from any waters diverted from the south tributaries of Hunter <br />Creek, Lime Creek, Last Chance Creek or any of them. <br /> <br />The Twin Lakes Reservoir and Canal Company shall not be <br />required to refrain from diverting water under its existing decrees <br />from the Roaring Fork River except to the extent that a like qp.antity <br />of replacement water is furnished to said company without charge <br />therefor through and by means of project diversions. <br /> <br />11 <br /> <br /> <br />If by reason of storage capacity in the Ruedi Reservoir, <br />or any reservoir constructed in addition thereto, the Twin Lakes <br />Reservoir and Canal Company derives additional water or other benefits <br />or advantages it would not have realized had this project not been <br />constructed, then nothing herein contained shall prevent the project <br />from making appropriate charges for such water or other benefits or <br />advantages. All revenues derived from the use of water stored in <br />Ashcroft Reservoir shall be used to assist in the repayment of the <br />construction, operation and maintenance costs of that reservoir, or <br />any reservoir constructed in lieu thereof, as may be determined by <br />the Secretary of the Interior. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.