Laserfiche WebLink
<br />Tabl e 2. --Existing a7!d projected additionaL powerpZant capacities <br /> <br />through the year 2000 for impacted s~~y reaches in the <br /> <br />Upper CoLorado River Basin <br /> <br />~ <br /><:> <br />~ <br />-...J <br /> <br />Powerplant capacity <br /> <br />Total <br /> <br />(megawatts) <br /> <br />powerplant <br /> <br />Study <br /> <br />reach <br /> <br />capac i tv <br /> <br />Existing <br /> <br />Projected <br /> <br />(megawatts) <br /> <br />(1975-76) <br /> <br />(2000) <br /> <br />....-.. . <br />White River----- 0 380 380 <br />Colorado River-- 85 180 1255 <br />San Juan River-- 2,840 1,180 4,020 <br />Green River in <br />Utah---------- 600 2,430 3,030 <br />Green River in <br />Wyoming------- 2,210 900 3,110 <br />Yampa River----- 430 1,140 1,570 <br /> <br />Totals---- <br /> <br />6,165 <br /> <br />12,365 <br /> <br />6,210 <br /> <br />lExisting Colorado-Ute Bullock powerplant, 10 megawatts, assumed to close <br /> <br />after 1975 and before 2000. <br /> <br />1"- <br />