Laserfiche WebLink
<br />~ <br />, <br /> <br />t' <br />., <br />.... <br />,. <br /> <br /><4t. <br />< ' <br />p.. <br />.-.'.'.- .. <br />~~;' ~ <br /> <br />~.~,;,... <br />,..y. <br />.... '~". <br />:~..."::~ <br /> <br />I <br />j <br />.1 <br />~ <br /> <br />....... <br />/tf;.. <br />}~<.) <br />....:::<-~":. <br />....,..... <br /> <br />;-':';::':;", <br />:,,' .:".::' ~ <br />-':'" -'.:'~ <br />';r;"-~: <br /> <br />..'....- <br />. ", <br /> <br />~, <br />',j <br />., <br />,., <br />,"1 <br />.~ I <br /> <br />.'! <br /> <br />., <br /> <br />;:1 <br />~':.' <br />::.; <br />;:i <br />" <br />" <br /> <br />o <br />0) <br />00 <br />CC <br /> <br />Cost Estimate - Piedmont Bridge Dam and Reservoir (Cont'd.) <br /> <br />Item. <br /> <br />Utilitiee Relocation <br />'20" Steel Water Main <br />l6" Steel Water Main <br />8" Steel Water Main <br />Phono Line <br />Power Line (2'2KVl <br />Pumpil18 Plant <br />Cemetery Moving <br />1'I,0.IV. <br /> <br />Unit <br /> <br />Quantity Unit Cost <br /> <br />Total Cost <br /> <br />135,OOO <br />112,200 <br />7,000 <br />2,000 <br />l'2,OOO <br />4,000 <br />40,000 <br />370,00~ <br /> <br />$ 8,005,360 <br />'2,801,876 <br /> <br />$lO,807,236 <br /> <br />$10,8l0,OOO <br /> <br />To convert 1946 coste to coete ae of September, 1949, uee factor <br />qf l.3388 which is value determined from Engineering Newe Record'e <br />index of coete. The 1949 estimated cost ie $14,472,428 which wae <br />rounded to $14,472,000. <br /> <br />miles <br />miles <br />miles <br />miles <br />milss <br />lump sum. <br />1 ump eum. <br />1 ump sum. <br /> <br />4.5 30,000.00 <br />5.1 22,000.00 <br />0.7 10,000.00 <br />2.0 1,000.00 <br />4.0 3,000.00 <br /> <br />Subtotal <br />Engineering and Contingencies - 35% <br /> <br />Total Eetime. ted Project Coets <br /> <br />Call <br /> <br />(9) <br />