<br />'; :~.\i;,::;'<;';i'~::;i f:.,:-" . _J. >"....~_,_;,-_~.:.,..c; .
<br />
<br />..'t,'._,.:",.><,;".......
<br />
<br />l"-
<br />":f'
<br />r--
<br />
<br />32
<br />
<br />~..'
<br />
<br />'-"
<br />...J
<br />
<br />STREAMFLOW
<br />
<br />c:)
<br />
<br />Rio Nambe below Nambe Fall~ Dam, near Nambe, N. Mex.
<br />
<br />Location.- Totalizing flowmeters, lat 35"'50'46", long 105"'54'17', in NE1 14SW1 14 sec. 29, T.l9 N., RIO E., in Nambe Indian Reservation,
<br />in outlet conduits at Nambe Falls Dam, 300 feet upstream from Nambe Falls, 2.6 miles upstream from confluence of Ria Narnbe and
<br />Rio En Media, 4.4 miles southeast of Nambe Pueblo, and 5.4 miles southeast of Nambe.
<br />Draina~e area.-34.1 sq mi.
<br />AveralZ:e discharlZ:e.-16 years (1979~94), 16.3 ft3 Is (11,810 acre~feet per year).
<br />Extremes.-1979-94: Maximum discharge, 312 (t3/s June 9, 1979 (gage height, 1.96 feet), at site 1,100 feet downstream; no flow
<br />December 31,1994.
<br />Remarks.-Records good. Flow completely regulated by Nambe Falls Reservoir.
<br />
<br /> Monthly and yearly discharge, in cubic feet per second
<br /> Second- Maximum Minimum Runoff in
<br />Month foot-days daily daily Mean acre-feet
<br />January 44 3.5 O.SO 1.42 87
<br />Febnta ry 14 0.50 .50 .45 28
<br />March 267.4 16 .SO 8.63 530
<br />^pnl 526 30 12 16.97 1,040
<br />May 1,681 89 30 54.23 3,330
<br />June 2,075 109 45 66.94 4,120
<br />July 795 37 18 25.65 1,580
<br />August 230.5 20 .50 7.44 457
<br />September 44 5.0 .50 1.42 87
<br />October 237 10 4.00 7.65 470
<br />November 120.07 5.60 .53 3.87 238
<br />December 16,49 .60 .40 0.53 33
<br />Calendar year 1994 6,050.46 109 .40 16.60 12,000
<br />
<br />Rio Grande at Otowi Bridge, near San ndefonso, N. Mex.
<br />
<br />I ,ocation.-Water-stage recorder, lat 3S"'S2'2g', long 106"'08'30", in San IIdefonso Pueblo Grant, 400 ft downstream from bridge on State
<br />Highway 4,1.8 miles southwest of San Ildefonso Pueblo, 2.5 miles downstream from Pojoaque River, and 6.8 miles west ofPojoaque.
<br />Datum of gage is 5,488.48 ft above mean sealevel, datum of 1929. Prior to May 19, 1904, and July 25 to Oct. I, 19~, staff gage at site
<br />180 ft upstream at datum 2.02 ft lower.
<br />Draina~e area.-l4,300 sq mi, approximately (includes 2,940 sq mi in closed basin in San Luis Valley, Colo.).
<br />Avera2e dischar~e.-95 years (1896-1905, 1910-94), 1,540 ft3/s (1,116))00 acre-ft per year).
<br />Extremes.-1895-1905, 1910-94, Maximum discharge, 24,400 ft'ls May 23,1920 (gage height, 14.1 ft); minimum daily, 60 ft'ls July 4, 5,
<br />1902.
<br />Remarks.-Recards good. Flow partly regulated by Heron, EI Vado, and Abiquiu Reservoirs. Diversions above station for irrigation
<br />of about 620,000 acres in Colorado and 75,000 acres in New Mexico. Subsequent to May 1971 flow affected by releases of
<br />trans mountain water (rom Heron Reservoir.
<br />
<br /> Monthly and yearly discharge, in cubic feet per second
<br /> Second- Maximum Minimum Runoff in
<br /> Month foot-days daily daily Mean acre-feet
<br /> January 27,232 928 826 878 54,01 0
<br /> February 24,337 1,090 713 869 48,270
<br /> March 49,700 1,950 1,060 1,603 98,580
<br /> April 104,290 5,160 2,\50 3,476 206,900
<br /> May 182,320 8,560 3,410 5,881 361,600
<br /> June 120,790 6,410 2,480 4,026 239,600
<br />I July 32,159 1,570 655 l,m7 63,790
<br />August 25,360 1,510 263 818 SO,3oo
<br />September 25,985 1,460 740 866 51,540
<br />J October 26,447 1,170 583 853 52,460
<br />, November 22,121 1,220 505 737 43,880
<br />I
<br /> December 29,289 \,160 760 945 58,090
<br /> Calendar year 1994 670,030 8,560 263 1,836 \,329,000
<br />
<br />
<br />,
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />""";~"v"~"1
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />,~.;!-" ,~~:~ I
<br />f;tt.~~t ~ , [~;~ !
<br />~~.t~:'1<j~:,*.~~
<br />
|