Laserfiche WebLink
<br />';"'~ <br /> <br />(~ <br />r.~-" <br /> <br />TABLE 4-5 <br /> <br />SELECTED PLAN - AVERAC,E ANNUAL COST-BENEFIT ANALYSIS <br /> <br />~7 <br />~,',.. <br /> <br />Colorado River Basin Salinity Control Project <br />Big Sandy River Unit - Wyoming <br /> <br />ANNUAL ADVERSE EFFECTS 1/ <br /> <br />SELECTED PLAN IMPACTS: <br /> <br />Reduce salt loading by 52,900 tons or 5.00 mg/L annually. <br /> <br />Annual cost per mg/L = $434,120 (project) or $193,260 (federal). <br /> <br />~ Cost per ton of salt reduction = $41.03 (project) or $18.27 (federal). <br />;va <br />, ' SCS monitoring cost of $800,000 (annual = $70,100) and Ag Extension <br />Service information and education cost of $550,000 (annual = <br />$48,200) not included in average annual cost-benefit analysis. <br /> <br />1/ 50-year life at 8 5/8 percent interest (0.08625). <br /> <br />Price Index: 1986 <br /> <br />4-9 <br /> <br />I! .'..1. l_~ .. <br />\oJU LVA. <br />