<br />TABLE 4-3
<br />
<br />SELECTED PLAN - INSTALLATION COST DISTRIBUTION
<br />
<br />Colorado River Basin Salinity Control Project
<br />Big Sandy River Unit Wyoming
<br />
<br />Installation Cost
<br />Federal Salinity Funds
<br />
<br />Installation Cost
<br />Other Funds
<br />
<br /> Total Total
<br /> Technical land Salinity Land Othec
<br /> Item Installation Assistance Rights Cost Installation Rights Costs
<br /> Distribution Pipeline
<br /> and Ri sers 2,965,100 847,200 3,812,300 1,270,700 1,270,700
<br /> Motor, Pumps, and Valves 369,000 105,400 474,400 158,100 158,100
<br /> Wheel-Move Side-Roll
<br /> Sprinklers 4,373,600 1,249,600 5,623,200 1,874,400 1,874,400
<br />..,..
<br />I
<br />0- Irrigation Wasteway
<br /> System 443,700 126,800 570,500 190,200 58,000 248,200
<br /> Powerl i ne to
<br /> Eden Valley Project 1,883,500 1,883,500
<br /> Sub-Powerlines and
<br /> Accessories to Farms 415,200 415,200
<br /> Wildlife Habitat
<br /> Management 414,700 130,100 544,800 177,700 177,700
<br /> C 1/
<br /> c:.' GRAND TOTAL 8,566,100 2,459,100- 11,025,200 5,969,800 58,000 6,027,800
<br /> ,....
<br /> !---
<br /> c.r. Price Index: 1986
<br /> 0)
<br /> 1./ Does not include techn' eal assistance for CES ($550,000) and salinity monitoring (SCS - $800,000).
<br />
<br />Total
<br />I nstall-
<br />ation
<br />Cost
<br />
<br />5,083,000
<br />
<br />632,500
<br />
<br />7,497,600
<br />
<br />818,700
<br />
<br />1,883,500
<br />
<br />415,200
<br />
<br />722,500
<br />
<br />17,053,0001./
<br />
<br />l:'"i;,
<br />
<br />;>-;O'_':j
<br />
<br />it,
<br />
<br />t.,;~:- .
<br />
<br />t' ,~:: , ~.~:
<br />
<br />~,
<br />
<br />"-
<br />
<br />Fi:~"J,J
<br />
<br />;''<\ '.
<br />L,:";,,>-";,~
<br />
<br />f~~b
<br />
|