Laserfiche WebLink
<br />TABLE 4-3 <br /> <br />SELECTED PLAN - INSTALLATION COST DISTRIBUTION <br /> <br />Colorado River Basin Salinity Control Project <br />Big Sandy River Unit Wyoming <br /> <br />Installation Cost <br />Federal Salinity Funds <br /> <br />Installation Cost <br />Other Funds <br /> <br /> Total Total <br /> Technical land Salinity Land Othec <br /> Item Installation Assistance Rights Cost Installation Rights Costs <br /> Distribution Pipeline <br /> and Ri sers 2,965,100 847,200 3,812,300 1,270,700 1,270,700 <br /> Motor, Pumps, and Valves 369,000 105,400 474,400 158,100 158,100 <br /> Wheel-Move Side-Roll <br /> Sprinklers 4,373,600 1,249,600 5,623,200 1,874,400 1,874,400 <br />..,.. <br />I <br />0- Irrigation Wasteway <br /> System 443,700 126,800 570,500 190,200 58,000 248,200 <br /> Powerl i ne to <br /> Eden Valley Project 1,883,500 1,883,500 <br /> Sub-Powerlines and <br /> Accessories to Farms 415,200 415,200 <br /> Wildlife Habitat <br /> Management 414,700 130,100 544,800 177,700 177,700 <br /> C 1/ <br /> c:.' GRAND TOTAL 8,566,100 2,459,100- 11,025,200 5,969,800 58,000 6,027,800 <br /> ,.... <br /> !--- <br /> c.r. Price Index: 1986 <br /> 0) <br /> 1./ Does not include techn' eal assistance for CES ($550,000) and salinity monitoring (SCS - $800,000). <br /> <br />Total <br />I nstall- <br />ation <br />Cost <br /> <br />5,083,000 <br /> <br />632,500 <br /> <br />7,497,600 <br /> <br />818,700 <br /> <br />1,883,500 <br /> <br />415,200 <br /> <br />722,500 <br /> <br />17,053,0001./ <br /> <br />l:'"i;, <br /> <br />;>-;O'_':j <br /> <br />it, <br /> <br />t.,;~:- . <br /> <br />t' ,~:: , ~.~: <br /> <br />~, <br /> <br />"- <br /> <br />Fi:~"J,J <br /> <br />;''<\ '. <br />L,:";,,>-";,~ <br /> <br />f~~b <br />