<br />Installation Costs
<br />
<br />The total estimated costs to be expended during the installation period
<br />of the Selected Plan are $18,403,000. (See Table 4-2.)
<br />
<br />Structural work is estimated to cost $16,330,500. This cost includes
<br />$11,010,900 for installation of the onfarm improved irrigation systems,
<br />$691,900 for construction of the irrigation wasteway and regulating
<br />reservoir systems, $2,298,700 for construction of a 3-phase power line
<br />into the valley and to individual farms, and $2,329,000 for technical
<br />assistance and engineering services to he provided hy the SCS to install
<br />the planned works of improvement.
<br />
<br />Table 4-2
<br />
<br />SELECTED PLAN - PROJECT INSTALlATION COST ANALYSIS
<br />
<br />Colorado River Basin Salinity Control Project
<br />Big Sandy River Unit - Wyoming
<br />
<br />Project Component Cost Federal Non-Federal Total
<br /> Cost Cost Cost
<br />Installation of Onfarm Irrigation
<br />Systems $ 7,707,700 $ 3,303,200 $11,010,900
<br />Wasteway and Regulating Reservoir 443,700 248,200 691,900
<br />Voluntary Fish and Wildlife
<br />Habitat Replacement 414,700 177,700 592,400
<br />Power Line Installation 0 2,298,700 2,298,700
<br />Technical Assistance (SCS) 2,459,100 0 2,459,100
<br />Information and Education (CES) 550,000 0 550,000
<br />Monitoring and Evaluation (SCS) 800,000 0 800,000
<br />Totals $12,375,200 $ 6,027,800 $18,403,000
<br />
<br />Price Index: 1986
<br />
<br />" ' 1 < .. "
<br />Uu i~v
<br />
<br />4-4
<br />
<br />~
<br />;.\j
<br />,',j.
<br />\l;;4j
<br />
<br />,'J
<br />WJj
<br />
<br />~:;j
<br />U
<br />
<br />Hi ':
<br />'):"
<br />
<br />.,"(
<br /><"-.'
<br />
<br />it"
<br />,#,
<br />-....:;
<br />
<br />,.jo";
<br />0J
<br />
<br />~'l
<br />""
<br />
<br />'~, 'l\
<br />~.' ~
<br />,
<br />
<br />,.,
<br />
<br />Ii':!
<br />
<br />"'"
<br />
<br />'"-.,,.
<br />
<br />;z'o,
<br />~
<br />
<br />.:?L;
<br />
<br />"';.i
<br />
<br />~,,~
<br />~
<br />
|