Laserfiche WebLink
<br />!:, <br /> <br />.~ <br />- <br />M <br />o <br />C;) <br />. <br /> <br />GOVERNOR'S CENTRAL ARIZONA PROJECT ADVISORY COMMITTEE <br /> <br />SUPPORTING DOCUMENTS AND STUDIES <br /> <br />. <br /> <br />During the course of the investigation process, a number of draft reports and <br />discussion papers were prepared by the Interagency Study Team for use by the Governor's <br />CAP Advisory Committee and the public. These reports provided background information <br />on the CAP and described the issues and the potential solutions. At the request of the <br />Committee, several special reports and papers were prepared. Reports provided to the <br />Advisory Committee by the Study Team were discussed with the Public Involvement <br />Group and Indian Involvement Group prior to their distribution. <br /> <br />I <br />. <br /> <br />. <br /> <br />The three working groups met to discuss specific issues and solutions from May <br />through August. In concluding their deliberations, each group issued a report of findings <br />and recommendations. <br /> <br />. <br /> <br />This section of the Final Report provides a brief synopsis of these supporting <br />documents. Copies of the documents are available upon request from the Arizona <br />Department of Water Resources, 15 S. 15th Ave., Phoenix, Arizona 85007, phone <br />602-542-1554. <br /> <br />. <br /> <br />Description of the Central Arizona Project -- Draft report dated February 18, 1993 and <br />Final Report dated April 1993, prepared by ADWR <br /> <br />. <br /> <br />This report summarizes the various aspects of the Central Arizona Project, and <br />includes a discussion of the physical features, institutions, laws, water allocations, <br />contracts, and financial arrangements as they exist in 1993. Also included is a discussion <br />of the Central Arizona Project water supply and anticipated use of that supply in 1993. <br />The report provides much of the basic information necessary to understand current issues <br />of underutilization of CAP water. As a result of high public interest in this report, ADWR <br />revised this document and re-issued it in final form. <br /> <br />I <br />I. <br /> <br />. <br /> <br />FINAL REPORT AND RECOMMENDA TlONS <br /> <br />. <br /> <br />13 <br />