My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05087
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:16:53 PM
Creation date
10/12/2006 12:51:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8221.112
Description
Central Arizona Project
State
AZ
Basin
Colorado Mainstem
Date
9/30/1969
Title
Letter Report from the Secretary of the Interior re: Power Needs of the Central Arizona Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORGE E U.fH'iA!H1 <br />CHJ.rnt:lJ.r: ~ <br /> <br />ODE CONCINI <br />~ VIC!:.CHJ.IRM,^,', <br /> <br />Q(,c.c,_=::'\-:'\ <br />.,' I >-. "J" ;:, <br />'~"~,:;~S-</ <br />":':;.''..<'' <br /> <br />. MEMO!:"S <br />LtNTON CLAFltDC.( <br />J S. HOOf'fS <br />J, A, ~<O[1tfns <br />DOUGLAS J. \VALL <br />SIONF.Y 5 WOODS <br /> <br />-~L[Y f:. ~n.HH:R <br />rx({:urrvt Pl!lrC10f1 <br />AND <br />!';T,o.T! W,o.TEfl trlCINI en <br /> <br />2\riztlll:l ~!ltld'~II;dL' (~'1l'L'1l11l (C lllll111i~:,illlt <br /> <br />t ll.Of , 1(" I (l /.l t ~I '1" ,. ~ <br />0, M, LA':',~,I r~ <br />JOHN r 51.1 tnt <br /> <br />::'14 v!t,sr r.IO.";llor ~,;,'i~'.T. !".UII! 701 <br /> <br />t":: <br />L"') <br />(. <br />C <br /> <br />11l!l1l'1\i.\", 2ri';.t1ua B.=1t1Ll3 <br />T[lEf'HONE 2~a.7SGl <br /> <br />SQptomber 2~ 1~6? <br /> <br />, <br /> <br />(: <br /> <br />Hon. Halter J. Hickel <br />Secretary of the Interior <br />Interior Building <br />Washington, D. C. 20240 <br /> <br />Dear Secretary Hickel: <br /> <br />The Statement of the Managers on the part of the <br />House on the conference report on the Colora,do River Basin <br />Project (House Report No. 1861, 90th Congress, Second <br />Session) discusses responsibj,lities in determining the <br />size of the Granite Reef Aqueduct. On page 22 of that <br />report it is stated that "The conference language is in- <br />tended to fix the capacity at 3,000 cubic feet per <br />second if this is the desire 2,nd tne decision of the <br />State of Arizona 2,ncl it can be Sh01'iD that an aqueduct of <br />this capacity is economically justified and financially <br />feasible." <br /> <br />We wish to inform you by this letter that the <br />State of Arizona acting through the Arizona Interstate <br />Stream Cooonission has made the decision that it desires <br />the Granite Reef Aqueduct to be sized at 3,000 c.f.s. <br /> <br />As the hydrologic and costing studies of the <br />Bureau of Reclamation progress, the Arizona Interstate <br />Stream Commission \-Jould appreciate being kept informed <br />of findings so that we can maintain a continuing sur- <br />veillance of implications relative to aqueduct capacity <br />in excess of 2,500 c.f.s. <br /> <br />Sincerely, <br />/# tit <<< 0:_ <br />;:{t~J:j;Y::- _X:rl''< <br />"lESLF;1' E. STEINER <br />ExecutiVe Director <br /> <br />\-JESke <br /> <br />I: <br /> <br /><;, <br /> <br />'.'" <br />
The URL can be used to link to this page
Your browser does not support the video tag.