Laserfiche WebLink
<br />3C,Gtj <br />Tabla 6. Results of frequency analysis of recorded daily mean discharges for <br />April 15-May 14 for the St. Charies River <br />[Discharges arc in cubic feet per second; data are for stations f17108SOO, 07108800. 07108900. <br />and 0710'l000 combined (scelabte III <br /> Estimated dally Maximum Water year of <br />Date mean discharge at l1ICorded delly maximum recorded <br /> th8 0.01 e._enee mean discharge delly moan dlecMrga <br /> probeblllly <br />April 15 671 533 1942 <br />April 16 665 564 1942 <br />April 17 591 424 1987 <br />April 18 636 524 1987 <br />April 19 \,250 2,180 ]942 <br />April 20 1,310 1,850 1942 <br />April 21 1.890 1,930 ]942 <br />April 22 \,230 2,010 1942 <br />April 23 1,170 2,090 1942 <br />April 24 1,450 1,790 1942 <br />April 25 1,750 1,490 1942 <br />April 26 1,610 1,290 1942 <br />April 27 1,590 1,080 1942 <br />April 28 1,580 874 ]942 <br />April 29 1,800 813 1942 <br />April 30 2,130 751 1942 <br />May 1 2,430 890 1980 <br />May 2 2,070 868 1980 <br />May 3 1,900 703 1980 <br />May 4 2,110 766 1980 <br />May 5 2,020 681 1942 <br />May 6 2.040 700 1942 <br />May 7 2,360 735 1987 <br />May 8 2,050 742 1942 <br />May 9 2,030 800 1942 <br />May 10 2,120 850 1942 <br />May 11 2,290 910 1942 <br />May]2 2,150 968 1942 <br />May 13 1,960 802 1942 <br />May]4 1,960 636 1942 <br /> <br />28 U.. 01 Frequency Anelysls end the Extended Stnlemnow Predle\lon Procedure to Estimate Evecuetlon Datee lor the <br />Joint-Use Pool of Pueblo Reservoir, Coloredo <br />