My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05057
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:16:45 PM
Creation date
10/12/2006 12:48:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8270.100
Description
Colorado River Basin Water Quality/Salinity -- Misc Water Quality
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1983
Title
Colorado River Water Quality Improvement Program - Status Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 5. - Potential impacts of regulatory requirements <br /> <br />Law/regulation <br /> <br />Expected impacts on salinity control <br /> <br />Applicable requirements <br /> <br />1. Clean Water Act (Public <br />Law 95-217) <br /> <br />- NPDES (National Pollution <br />Discharge Elimination <br />System) <br /> <br />- 404 Permit <br /> <br />- Water Quality Standards <br /> <br />N <br />~ <br /> <br />2. Safe Drinking Water Act of <br />1974 (Public Law 93-523) <br /> <br />- Underground injection <br />control <br /> <br />3. Resource Conservation and <br />Recovery Act <br /> <br />4. OSHA (Occupational Safety <br />and Health Act) <br /> <br />NPDES permits for point source <br />discharge. Zero discharge effluent <br />goal. Salinity Control Forum NPDES <br />Policy. <br /> <br />Permit required for modifications of <br />navigable waterways. <br /> <br />Treatment technology commensurate with <br />instream water quality necessary to <br />support beneficial uses. <br /> <br />EPA minimum regulations for injection <br />wells. Wells are classified accord- <br />ing to waste type and nature of <br />disposal. <br /> <br />EPA regulations for disposal of <br />hazardous wastes and nonhazardous <br />solid wastes. <br /> <br />Set standards for worker exposure <br />in plant facilities. <br /> <br />Field investigation and testing <br />restrictions related to brine <br />di sposal . <br /> <br />Potential permit delays on field <br />activities. Design and material <br />changes for structures. <br /> <br />Structural and nonstructural <br />control methods required, as <br />necessary, to achieve applicable <br />State water quality standards. <br /> <br />Need for early coordination to <br />determine well classification and <br />permit needs. Could limit disposal <br />alternatives. Time and cost <br />requirements, if permit needed. <br /> <br />"Cradle to grave" provisions could <br />subject control facilities to <br />permit delays, siting constraints, <br />and higher costs of surface <br />disposal of brines. <br /> <br />Special provision for treatment of <br />gasses and fugitive emissions in <br />control facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.