Laserfiche WebLink
<br />~ <br />Cf.) <br />.., <br />. <br />~,! <br />c:.:.. 5 <br /> <br />Other participating parties or_cooperators that contributed to the completion <br />of thi s opi ni on are: the State of Utah. the Provo Ri ver Water Users. <br />Strawberry Water Users Association. Moon Lake Water Users Association. the Ute <br />Indian Tribe. other interested water users. and environmental groups. <br /> <br />This biological opinion addresses only those Colorado River listed fishes <br />likely to be jeopardized and/or their critical habitats which could be <br />adversely modified as a result of depleted flows in the Duchesne River Basin. <br />The Service recognizes that depletion of flows and the resulting impacts to <br />the Duchesne River also occur downstream on the Green River: however. the <br />Service is relying on the reoperation of Flaming Gorge Dam to help alleviate <br />potential impacts to the mainstem Green River. The biological opinion for <br />year-round reoperation of Flaming Gorge Dam is not yet completed. nor have <br />required flows been legally protected as required by Recovery Action Plan <br />items I.A.4 and I.B.3. <br /> <br />This biological opinion represents the Service's biological opinion regarding <br />the effects on Colorado River endangered fishes and their critical habitats <br />from historic projects that remain subject to Federal discretionary <br />involvement or control and from certain new projects that are federally <br />authorized. funded. or carried out. Ongoing studies authorized and funded by <br />the RIP, the Service. and other RIP cooperatDrs will be used to determine <br />where flexibility exists to reoperate Federal projects. The purpose of <br />reoperation will be to remove the threat of jeopardy and to avoid destruction <br />or adverse modification of critical habitats. <br /> <br />Site specific individual biological opinions for new projects will address any <br />direct physical impacts to the endangered fishes and other listed species. <br /> <br />Consultation Historv <br /> <br />Formal consultation on projects potentially affecting the Duchesne River Basin <br />began in the late 1970's for the Uintah and Upalco Units and in February 1980 <br />for the Strawberry Aqueduct and Collection System. However. existing projects <br />subject to continuing Federal discretionary control or involvement. or which <br />require additional Federal funding, permitting. licensing. or approval must <br />comply with section 7 (a) (2) of the Act at each stage of planning and <br />implementation. Consistent with 50 CFR 402.16. reinitiation of section 7 <br />consultation also is required when a new species is listed or critical habitat <br />is designated. as on the Duchesne and Green Rivers. <br /> <br />Previous biological opinions issued for major Federal water projects in the <br />Duchesne River Basin concluded with jeopardy determinations for the endangered <br />