Laserfiche WebLink
<br />t- <br />eo <br /> <br />" . <br />~ .~ <br />C.' <br /> <br />\,.. <br /> <br />3 <br /> <br /> TABLEt <br />ESTIMATES OF DEPLETIONS TO THE DUCHESNE RIVER RESULTING FROM FEDERAL <br /> PROJECTS <br />ProjecI Owner/Operator Lead Federal Average Annual <br /> Agency Depletion (Acre-Feet) <br />Pre-Central Utah Project <br />Strawberry Valley (SYP) USBRlSWUA USBR <br />SYP Transbasin Diversion 61,500 II <br />Reservoir Evaporation (SYP) 11,800 " <br />Subtotal 73,300 <br />Provo River USBRlPRWUA USBR 31700 1I <br />. . <br />Moon Lake USBRlMLWUA USBR 24.500 " <br />Midview Exch. (Midview Res.) BlA BlA 5,000 " <br />Ule Indian Irrigation Project (UIIP) BIAlUte Tribe BlA 144,000 " <br />Central Utah Projecl <br />Bonn. Unit Transbasin Diversion USBRlCUWCD CUWCDIUSBR 101,900 II <br />Reservoir Evaporation <br />Strawberry Reservoir 17.700 " <br />Starvation Reservoir 6,80071 <br />Upper SliIlwaler Reservoir 30071 <br />Curranl Creek Reservoir 50071 <br />Duchesne River Area Irrigation 16,000" <br /> , <br />Bonneville Unit TOTAL 143.200 <br />SUBTOTAL (Historic) 402,700 <br />Uintah Basin Replacemenl Project <br />Uintah Unit DOUCUWCDlBlA CUWCDIDOl 15,000" <br />Upalco Unit DOUCUWCDlBlA CUWCDIDOl 10,300101 <br />SUBTOTAL (New) 25.300 <br />TOTAL (Historic and New) 447,000 <br />