My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04962
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04962
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:26:50 PM
Creation date
10/12/2006 12:46:08 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8050.100
Description
Section D General Statewide Issues - State Policies - General
State
CO
Date
1/1/1997
Author
Colorado Farm Bureau
Title
Agricultural Water Policy Development - Reference Materials - Colorado Water Development Study-Sections 5,8, and 9 From Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(Jllll."! <br /> <br />.1 <br />-.n <br /> <br />Sel'/ivn 5 . Co!orvd" miter Use Trends <br /> <br />~ <br /> <br />I <br />TI <br /> <br />I <br />TI <br /> <br />1 <br />T1 <br /> <br />l <br />n <br /> <br />I <br />n <br /> <br />I <br />ri <br /> <br />I <br />n <br /> <br />. <br />, <br />., <br /> <br />I <br />, <br />., <br /> <br />, <br />I <br />., <br /> <br />. <br /> <br />500.000 <br /> <br />450,000 <br /> <br />400,000 <br /> <br />350.000 <br />300,000 <br /> <br />2SO.000 <br /> <br />200.000 <br />150.000 <br /> <br />100.000 <br />1980 <br /> <br />80,000 <br /> <br />70.000 <br /> <br />60,000 <br /> <br />SO,OOO <br /> <br />40.000 <br /> <br />30.000 <br /> <br />20.000 <br /> <br /> <br />Projected <br />Additional <br />Supply Required <br />= 100,000 ac-ft <br />to 200,000 ac-ft <br /> <br />-+- Projected Demand <br />Based on Population <br />Projections <br />_ Projected Demand <br />Based on Survey <br />2000 2020 2040 2060 2080 2100 Results <br /> <br />Year <br /> <br />Figure 17 <br />Projected M & J Demand vs. Dry-YearY/eld <br />Water Division 2 <br /> <br /> <br />Projected <br />Additional <br />Supply Required <br />=12,000 ac~ft <br />to 41.000 ac.ft <br /> <br />-+- Projected Demand <br />Based on Population <br />Projections <br /> <br />_____ Projected Demand <br />Based on Survey <br />Results <br /> <br />10,000 <br />1980 2000 2020 2040 2060 <br /> <br />2080 2100 <br /> <br />Year <br /> <br />Figure 18 <br />Projected M & I Demand vs. Dry-Year Yield <br />Water Division 4 <br /> <br />5.7 <br /> <br />__ COLoraDo <br />.._ Farm Bureau <br />
The URL can be used to link to this page
Your browser does not support the video tag.