Laserfiche WebLink
<br />SPILLWAY REPAIRS <br /> <br />Glen Canyon <br />Estimated $30,057,000+ - construction cost only <br /> <br /> T ota 1 Percent <br />To Be Allocated To Percent Paid by Power Amount <br />Power 61.7254 18,552,803 <br />Irrigation 32.4257 9,746,193 <br />M&I Water 1. 6789 504,627 <br />Fish & Wildl ife 4.1700 1,253,377 <br /> 100.0000 94.1511 30.057.000 <br /> <br />Total Amount <br />Paid by Power <br /> <br />28.298.996 <br /> <br />Fl ami ng Gorge <br /> <br />Estimated $806,000 <br /> <br />To Be Allocated To <br /> <br />Percent <br /> <br />T ota 1 Percent <br />Paid by Power <br /> <br />Amount <br /> <br />T ota 1 Amount <br />Paid by Power <br /> <br />Power <br />Irrigation <br />Fi sh & Wildl ife <br /> <br />51.4 <br />33.5 <br />15.1 <br />100.0 <br />= <br /> <br />84.9 <br /> <br />414,284 <br />270,010 <br />121,706 <br /> <br />806.000 <br /> <br />684 .294 <br /> <br /> Blue Mesa <br />Low Bid $543,000 <br /> Total Percent Total Amount <br />To Be Allocated To Percent Paid by Power Amount Paid by Power <br />Power 85.6 464,808 <br />Irrigation 9.1 49,413 <br />Flood Control 5.3 28,779 <br /> 100.0 2i:l 543.000 514.221 <br /> = <br /> <br />26 <br />