Laserfiche WebLink
<br />~ <br />~ <br />~ <br /> <br />Appendbt VI <br />Comments From the Bureau. of Reclamation <br /> <br />, <br />,,' <br /> <br />" <br />~':':' <br />, <br /> <br />'I <br /> <br />8. We disagree with this comment. Facilities to physically convey water to <br />the Colorado Ute tribes are plarmed to be constructed only in the second <br />phase of the Animas-La Plata project. While the Ute tribes receive <br />ownership of water in the first phase of the project, the tribes' water will <br />be stored in the Ridges Basin Reservoir until the project's second phase is <br />constructed, We have substituted the phrase "physically convey" for <br />"deliver" for more specificity throughout our report. <br /> <br />n~', <br /> <br />.~{ <br />'., <br /> <br />'!:: <br /> <br />'F <br /> <br />" <br /> <br />.' <br /> <br />,...;, <br /> <br /> <br />'Ii <br /> <br />Page 31 <br /> <br />GAOJRCED-96-1 Anlmas-La Plata Project <br />