My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04888
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:16:03 PM
Creation date
10/12/2006 12:44:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
11/1/1995
Author
U. S. Gen. Acc. Off.
Title
Status and Legislative Framework - Animas-La Plata Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Appendix IV <br />Development of a Reasonable and Prudent <br />Alternative <br /> <br />I <br /> <br />1:' <br />4 <br /> <br />.:;; <br /> <br />in the San Juan River. The final biological opinion required that, as part of <br />the fish study and recovery program, approximately 300,000 acre-feet of <br />water annually be periodically released from the Navajo Dam and <br />Reservoir located upstream on the San Juan River and that these water <br />releases be protected through the squawfish's habitat. According to the <br />final biological opinion, none of the project's additional facilities can be <br />constructed and no additional water can be depleted from the Animas <br />River for the project until the study is completed and the Service <br />detennines that the squawfish would not likely be jeopardized. <br /> <br /> <br />Construction of the Project <br /> <br />Bureau officials told us that the alternative is a means of starting <br />construction on the full Animas-La Plata project-in other words, it is an <br />incremental step toward completing the full project. Whereas the full <br />project will annually deplete approximately 155,000 acre-feet of water <br />from the river and physically convey it to the areas where it will be used, <br />the alternative annually depletes roughly one-third of this amount of water <br />and does not include facilities to physically convey the water from the <br />Ridges Basin Reservoir to the areas where it will be used. A memorandum <br />of understanding attached to the Service's final biological opinion fonnally <br />recognizes the Bureau's position on the alternative: "The SeIVice is <br />preparing a biological opinion for the Animas-La Plata Project that <br />contains a reasonable and prudent alternative which provides for <br />construction of an initial portion of the project." <br /> <br />The importance of the alternative as a means of starting construction was <br />emphasized by the Solicitor for Interior's Southwest Region in a <br />December 1990 briefing paper: <br /> <br /> <br />.. . , construction of a portion of [the AniInas-La Plata project] represents a gamble that <br />more may be built later. This is important because that is the only way the Ute 'liibes will <br />benefit and their water rights claims will finally be settled under the 1988 water rights <br />legislation.' <br /> <br />Water Protection <br /> <br />The Service's final biological opinion states: "It is not enough to only <br />release water from the Navajo Dam. There also must be guaranteed <br />delivery of the water so that it provides the habitat improvement <br />necessary to maintain and increase the endangered fish population in the <br />San Juan River." Such protection, according to the final biological opinion, <br />the memorandum of understanding, and Interior officials, is under the <br />legal jurisdiction of the Navajo Nation and the states of Colorado, New <br />Mexico, and Utah. <br /> <br />Page 21 <br /> <br />GAOIRCED-96-1 Anlmas-La Plata ProJeet <br />
The URL can be used to link to this page
Your browser does not support the video tag.