Laserfiche WebLink
<br />.' <br /> <br />( <br /> <br />.' <br /> <br />fully using its basic apportionment in 1993 as '''ell as in <br />1995. <br /> <br />. <br /> <br />E'ullysatisfying the Colorado River water needs of the <br />Basin states means the amount of their apportionment that <br />they would likely use for the period being considered plus <br />the maximum amount that any state would realistically need in <br />excess of its basic aooortionment. These consumotive use <br />schedules, as well ai"alternative build-uo sche~ules for <br />AriZOna's use of its basic apportionment, are for evaluation <br />purposes only. <br /> <br />Other operating rules for the GO-month stucles would <br />remain the same as the 24-month studies in that the target <br />objective would be. to have a ~ull Lake Powell. reservoir <br />condition (22.6 million acre-feet) on January 1 of each year. <br />As in the case of the 24-month studies, consideration on a <br />year-to-year basis also would be given to deferring the <br />September 30 storage equalization requirements of Lake Powell <br />and Lake Mead until the end of the calendar year during years <br />when the 3asin states' Colorado River '''ater needs were fully <br />met. <br /> <br />There is little oc no riSk to rese~voir storage under an <br />operating plan decision to fully meet the needs of the Basin <br />states for the operating plan year if reservoir system <br />storage recovers during the 60-month period under a probable <br />minimum water supply scenario, esoeciallv if reauired flood <br />control releases in eKcess of c.o',./r\str:eam needs oucioq that <br />oeriod exceed the increased water use orovided for bv the <br />decision or if surplus deliveries are made to ~exico. Uncler <br />such conditions, increased water use decisions should be on <br />an un interruptible basis. In other cases, water supply <br />decisions, including whet~e= ~ate= supply co~~it~ents a.re <br />i~t.e::u?tible or uninterruptible",. si}oulo- consi"der, all <br />relevant factors as provided foe in" the Operati"ng Criteria. <br />By no later than October 1, the besinning of the ope:ating <br />year, the Secretcry of the Inter ior '..;ould :elease the annual <br />operating plan so that water a~d po~er operations can be <br />appropriately scheduled and imple~e~~ed for the following <br />year. <br /> <br />A one or two page summary of the GO-month operational <br />studies (suggested example format attached) would be prepared <br />to suooort the decision orocess. Kev items deoicted on the <br />5-yea-( summary would include Lake" Powell January 1 and <br />September 30 contents, Glen Canyon Qarn annual ~ater year <br />releases, Lake ~\ead September 30 cont~nts, January 1 <br />reservoir system vacant storage space, Hoov~r Dam flood <br />concrol releases, lower Basin co~sumptive use, and annual <br /> <br />.-5- <br />