Laserfiche WebLink
<br />(spill) within a 5 year period. Normal conditions would not require a flood control <br />release'from the system during the same time period. <br /> <br />Based on the results of this study, the Commission Etaff cannot encourage consideration of <br />surplus water deliveries to the lower basin at this time. The hydrology necessary to <br />support such deliveries is improbable. <br /> <br />The "in house" techniques used in this report represent new capabilities for the <br />Commission. The staff recommends that these techniques be considered for further <br />developmental improvement and used annually to identify the probability of surplus flows <br />under diverse operating scenarios. <br /> <br />6 <br />