My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04844
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:27:46 PM
Creation date
10/12/2006 12:41:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
11/5/1974
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 2-Approved and Transmitted
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Activity - <br />Subactivity <br /> <br />Participant <br /> <br />Subactivity 10 -- Documentation of MRBC Staff <br /> the Differences <br /> Between the Modified <br /> Central Case and the <br /> Regi ona 1 Preference <br /> Future <br />Subactivity 11 -- Regroup and ~,lRBC Staff <br /> Screen Problems <br />Subactivity 12 -- Develop Final MRBC Staff <br /> Probl em and <br /> Issues list <br /> <br />Group A <br /> <br />I <br />"" <br /> <br />Overview <br />Commi ttee <br /> <br />tlRBC <br /> <br />1413 <br /> <br />Designated Responsibility <br /> <br />~ <br /> <br />Finalize the differences between the modified central case and <br />regional preference future within each ASA for socio-economic <br />projection and associated water and land use projections, <br />assumptions and methodologies. <br /> <br />Develop a problem list using results of subactivity 2, which <br />is consistent with the regional preference future. <br /> <br />Develop a final problem list, using results of subactivity 11 <br />and display the results (including (1) problems; (2) problem <br />areas and analytical areas; and (3) time frame (1975-1985 and <br />1985-2000) the problem becomes severe if not resolved) using <br />a regional map, and Figures 3 and 4; and prepare a technical <br />memorandum descri bi ng acti vi ty two results. <br /> <br />Review and comment on subactivity 12 information and results. <br /> <br />Review and approve the technical memorandum documenting the <br />results of activity two. <br /> <br />Endorse the technical memorandum documenting the results of <br />activity two and transmit it to l.IRC. <br /> <br />ACTIVITY THREE -- DEVELOPMENT OF INFORMATION <br />DESCRIBING SELECTED PROBLEMS <br /> <br />Subactivity 13 -- Develop Effects <br />Information for <br />Each Problem <br /> <br />MRBC Staff & <br />Group A <br /> <br />Group A <br /> <br />Subactivity 14 -- Define Potential r,lRBC Staff <br />Level B, Special <br />L~vel C Study Areas <br />and Implementation <br />Pt'ogram Areas <br /> <br />Group A <br /> <br />Evolve the effects information for both the modified central <br />case and the regional preference future using Figure 6 to <br />display by year (1975, 1985, and 2000). <br /> <br />Review the staff results of subactivity 13. <br /> <br />Define tentatively study and analytical areas for Level B <br />studies, special studies, Level C studies and implementation <br />program areas for resolving the problem vlithin the region. <br /> <br />Revie\~ the staff results of suoactivity 14. <br />
The URL can be used to link to this page
Your browser does not support the video tag.