My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04844
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:27:46 PM
Creation date
10/12/2006 12:41:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
11/5/1974
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 2-Approved and Transmitted
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE 1 -- PARTICIPANTS AND DESIGNATED RESPONSIBILITIES <br /> <br />11/12/74 <br /> <br />Activity - <br />Subactivity <br /> <br />Parti ci pant <br /> <br />Des i gna ted Respons i bil ity . <br /> <br />PHASE I <br /> <br />ACTIV ITY ONE n PREHlPLEnENTATION <br /> <br />tlRI3C Staff <br />and i1RBC <br /> <br />Prepare and Consummate the Merorandum of Agreement, <br /> <br />PHASE II <br />ACTIVITY ONE -- PROBLEr1 IDHITIFICATION <br /> <br />1-115 <br /> <br />Subactivity 1 -- Participant <br />Selection <br /> <br />~1RBC <br /> <br />Select Group A and Group B participants1/ <br /> <br />Subactivity 2 -- Develop Initial <br />Problem and Issues <br />List <br /> <br />Group A <br /> <br />Locate, categorize and briefly describe existing and potential <br />future problems by time frame (1975-1985 and 1985-2000) <br />utilizing a regional map and Figures 3 and 4, <br /> <br />Subactivity 3 -- Define Tentative <br />Analytical Areas <br /> <br />MRBC Staff <br /> <br />Compile the results of subactivity 2 and tentatively select <br />analytical areas which approximate the problem areas. <br /> <br />I <br />, ~ <br /><0 <br />I <br /> <br />Group A <br /> <br />Review and verify rlRBC staff analysis. <br /> <br />Subactivity 4 -- Obtain Regionwide Group B <br />Review and Reaction to <br />Problems and Issues <br /> <br />Review and comment on subactivities 2 and 3 and supplement <br />information in subactivities 2 and 3. <br /> <br />j'lRBC Staff <br /> <br />Synthesize the results of subactivity 4. <br /> <br />Overvi e\~ <br />Committee <br /> <br />Review and approve the technical memorandum documenting the <br />results of activity one. <br /> <br />i1RBC <br /> <br />Endorse the technical memorandum documenting the results of <br />activity one to be transmitted to WRC. <br /> <br />1/ A relatively small overview committee of the MRBC has been given the responsibility for the National Assessment <br />- on behalf of the MRBC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.