My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04836
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:50 PM
Creation date
10/12/2006 12:41:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.300.10
Description
San Juan Recovery Implementation Program
Basin
San Juan/Dolores
Date
2/1/1995
Author
SJRIP
Title
San Juan River Basin Recovery Implementation Program - RIP Side by Side Analysis
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />Historic projl'Cts <br /> <br /> <br />I <br /> <br />San Juan RIP <br /> <br />I <br /> <br />It is anticipated that section 7 <br />consultations will be initiated tor all <br />existing federal actions within the <br />baseline for the A-LP that are subject to <br />consultation. The Service concluded <br />that the reasonable and prudent <br />alternative will offset 57,100 acre-feet <br />of depletion tor the A-LP in addition to <br />the depletions in the baseline. The <br />operation of Navajo Dam to benefit the <br />listed fish will be taken into account by <br />the Service in its biological opinions on <br />the depletion impact of these existing <br />federal actions. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />v - L <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />~t..p <br />. . <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Upper Colorado RIP <br /> <br />The Recovery Program is intended to <br />offset both the direct a.o.d depletion <br />impacts of historic projects occurring <br />prior to January 22, 1988 (the date <br />when the Cooperative Agreement for the <br />Recovery Program was executed) if such <br />offsets are needed to recover the fishes. <br />An increase in depletions from a historic <br />project occurring after January 22, <br />1988, will be subject to the depletion <br />charge. As long as the Recovery <br />Program is serving as the reasonable and <br />prudent alternative, depletion charges or <br />other measures will not be required from <br />historic projects which undergo section <br />7 consultation in the future. <br /> <br />~ <br /> <br />-~-, <br />
The URL can be used to link to this page
Your browser does not support the video tag.