Laserfiche WebLink
<br /> <br />IS l~; <br /> <br />CONSTRUCTION UTILITIES <br /> <br />1<l5 <br /> <br />fer will be similarly effected to the counties of Riverside and San <br />Bernardino of the respective portions of the Desert Center-Earp <br />road situated in each. <br /> <br />WORK <br /> <br />TAIlLE 13 <br />CONSTRUCTION ROAD SYSTEM <br />CoslS 10 June 30, 1938 <br />MII.ES DATE C(J~IPLETEI) <br /> <br />Surve,,'s ......... <br />Construction <br />Garnel to InJio <br />Dest"rt Center tu Earp. n. ........mn <br />Rrunch (0 Di\'ision 3 headquarters <br />F:arp 10 Parker dam 1......... <br />Branch to Division 1 headqllnrterli.-. <br />Branch to Intake pumping plant.. <br />Br~nch to Division 2 heudqunrters__...... <br />Training ditches. .....n___m............. <br />Slale Highway Div., (Sha\er's Summit road) <br />Hayfield pumping plant road.. <br />Subtotlll, construction <br />Maintellllnce <br /> <br />. 35.88 <br />............... 83.96 <br />i.71 <br />15.32 <br />2..39 <br />1.99 <br />:?4J <br /> <br />JlIl~' 26,19.1.1 <br />Aug. 15.193.J <br />No\', 17.1933 <br />Jan. 22,1934 <br />Jan. 22.1934 <br />M" 23. 1934 <br />No~', 10,1934 <br /> <br />3.50 <br />.........................153.18 <br /> <br />No\'. 29,1937 <br /> <br />s <br /> <br />CO!'T <br />9.232.90 <br /> <br />185.851.80 <br />389.555.87 <br />47.i81.28 <br />53.713.10 <br />38,968.72 <br />140.900.0i <br />8.969.83 <br />1.3i4.51 <br />20.000.00 <br />7.028.88 <br />903.3i6.96 <br /> <br />I 93.J <br />1934 <br />1935 <br />1936 <br />1937 <br />19.JB <br /> <br />5 <br />$I 9.26B.22 <br />15.B96.92 <br />19.,40.36 <br />38.469.46 <br />22.589,39 <br />7.956.,5 $ 123.921.I0 <br />-- <br />51.027.298.06 <br /> <br />To J line 30. <br />GIIAND TOTAL ............ ....................153.18 <br /> <br />IGrading uf ((.aJ from Earp to Parker Jam was Jone by City of Los Angeles; fl;JVl'j! <br />and completed by District. Roads to Division I and Intake had heavy rock cuts and fills. <br />