Laserfiche WebLink
<br /> <br />. "'" t..:'.' <br />luu l <br /> <br />\~ <br /> <br />8 <br /> <br />METROPOLITAN WATER DISTRICT <br /> <br />, <br />J <br /> <br />P'roject cost <br />The construction cost of this initial development of the project <br />can now be determined, except for such further credits as may be <br />appiied, due to sales of salvage material on hand in the Banning <br />storage yard and in Los Angeles, and for the few remaining con- <br />struction items whose cost must be estimated. The following tabu- <br />lation compares the construction cost to June 30, 1941 with the bond <br />issne estimate pubiished in Juiy 1931, prior to the bond eiection of <br />September 29, 1931. The cost includes an amount to cover the <br />estimated cost of a San Marino lateral, a possible extension of the <br />Orange County feeder, and completion of the project, at some <br />future date, to a delivery capacity of 750 cubic feet per second. <br />Included in this additional work are two units in each pumping <br />plant and several distribution feeder iines within the District area. <br />The estimates of the deferred items to complete to the uitimate <br />delivery of 1,500 cubic feet per second are also shown. It will be <br />seen that the cost of the items contemplated in 1931 underruns the <br />bond issue estimate by $20,844,000, and underruns the $220,000,- <br />000 authorized bond issue by $22,000,000. With the cost of the <br />initial water softening and filtration plant added, the underrun <br />of the bond issue is $18,300,000. <br /> <br />TABLE 1 <br /> <br />COWRADO RIVER AQUEDUCT COST ESTIMATES <br /> <br />BOND ISSUE <br />E5TlMATE <br /> <br />Inilial construction (10 deliver 750 c.f.s.) <br />Diversion dam ___.... <br />'Main aqueduct ___......, <br />Terminal storage .....m. <br />Delivery lines nm. ....m.n_...... 00 <br /> <br />JULY 1931 <br />.... ....$ 13.058,000 <br />...... 143,470,000 <br />........ 17.352,000 <br />... 44,964,000 <br /> <br />... .$218,844,000 <br /> <br />12.888,000 <br />13.320,000 <br />........ 38.484.000 <br /> <br />Total Initial Cost m"" .................___ <br />Deferred items (to complete to 1.500 d.s.) <br />Main aqueduct m...m.. <br />Terminal storage 00 <br />Delivery lines mm <br /> <br />Total Dererred Cost ..m.. ....... ....nmmS 64.692,000 <br />Total ultimate construction cost, exclush.e of wBler <br />softening ........ .....mm................n .....n........._m....... <br />Estimated cost of water sohening, nol included in <br />bond issue estimale <br />JniliBl plalll ___mm........ <br />Half.capacity plants .m..m <br />Full.capacily plants ....moo <br /> <br />...!283,536,000 <br /> <br />TOlaI ultimate construction cost. inclusive or water <br />.o;oftening ......n.nuumu.. ........._... nn.unm....... <br /> <br />1 <br />1 <br /> <br /> COST <br />JUNE 30, ]9.12 <br />! 8,000.000 <br /> 134.000,000 <br /> 15.000,000 <br /> 41.000.000 <br />1198,000,000 <br /> 19,500,000 <br /> 5,400,000 1 <br /> 34,600,000 <br />! 59.500,000 j <br />$257,500,000 I <br />$ (3.700.000 I I <br />(9,000,0001 I <br /> 16.500.000 <br /> , <br />$274,000.000 I <br /> i <br /> 1 <br />