My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04816
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04816
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:45 PM
Creation date
10/12/2006 12:40:07 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.800.10
Description
Colorado River Basin Salinity Control - Federal Agencies - Joint Reports
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1992
Title
1991 Joint Evaluation of Salinity Control Programs in the Colorado River Basin
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'""'" <br />c..<> <br />en <br />00 <br /> <br />Overview <br /> <br />The salinity control program in the Colorado <br />River Basin was authorized by the Colorado <br />River Basin Salinity Control Act of 1974 (Public <br />Law 93-320), as amended by Public Law 98-569. <br /> <br />As required by the Clean Water Act (Public <br />Law 92-500), existing numeric salinity criteria <br />and the plan for implementing the salinity <br />control program must be reviewed every 3 years. <br />The last review was documented in Report on <br />the 1990 Review, Water Quality Standards for <br />Salinity, Colorado River System, May 1990. The <br />salinity control plan identified in that review <br />satisfies salt load reduction objectives and <br />program goals by maintaining average total <br />dissolved solids (TDS) at Imperial Dam at or <br />below 879 milligrams per liter (mgIL), while the <br />Basin States continue to develop their <br />compact-apportioned waters. The 1990 salinity <br />control plan is the officially adopted plan. <br /> <br />This 1991 joint evaluation report, prepared by <br />the U.S. Department of the Interior and the <br />U.S. Department of Agriculture, describes <br />adjustments to the salinity control plan <br />identified in the 1990 review. The adjustments <br />consist of (1) removing Bureau of Land <br />Management projects from the repayment <br />analysis; (2) analyzing the transfer of $10 <br />million from the Lower Colorado River Basin <br />Development (LCRBD) Fund; (3) making various <br /> <br />changes in costs; (4) modifying implementation <br />schedules to reflect delays, etc., in projects such <br />as G1enwood-Dotsero Springs Unit and Uinta <br />Basin Stage 1; and (5) updating salt removal <br />accomplishments through 1991. <br /> <br />This report also outlines the coordination efforts <br />needed to effectively implement the salinity <br />control program and describes major program <br />activities through fiscal year 1991. Figure 1 <br />shows the locations of the Department of the <br />Interior and Department of Agriculture salinity <br />control units. Table 1 shows the salinity control <br />plan. <br /> <br />The salinity control plan will remove about <br />1.5 million tons of salt annually from the <br />Colorado River system by the year 2010 at a <br />remaining cost of approximately $604 million. <br /> <br />Public Law 93-320 and its amendment require <br />that a percentage of the Federal cost ofthe <br />salinity control program be repaid from the <br />Upper and Lower Basin water development <br />funds with revenue generated from the sale of <br />hydropower. Repayment analysis of the LCRBD <br />Fund prepared for this evaluation shows that <br />sufficient funds are available to cover all costs of <br />the salinity control plan, The LCRBD Fund can <br />repay its share of the costs with an inflation rate <br />of 3.4 percent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.