Laserfiche WebLink
<br />The plan of implementation requires that the Forum's <br /> <br />permanent Work Group analyze the progress and results of the <br /> <br />salinity control program as well as other actions in the <br /> <br />o <br />~ <br />~ <br />C) <br /> <br />Basin which impact on the river's salinity. In addition, the <br /> <br />states, through the Forum, have agreed to submit an annual <br /> <br />report to the Environmental Protection Agency summarizing tha <br /> <br /> <br />results achieved by the salinity controL program and the <br /> <br />effect of other actions in the Basin having an influence on <br /> <br />salinity. This report covers the period October 18, 1982 - <br />September 30, 1983. 1/ <br /> <br />!later Supply <br />The virgin flow at Lee Ferry, as estimated by the U.S. <br />Bureau of Reclamation for th~ water years 1973 through 1982 <br /> <br />is shown on Table 1. <br /> <br />TABLE 1 <br />Virgin Flow at Lee Ferry <br />(1,000 Acre-feet) <br /> <br />. <br /> <br />Water Year <br />1973 - <br />1974 <br />1975 <br />1976 <br />1977 <br />19'78 <br />1979 <br />'1980 <br />1981 <br />1982 <br /> <br />Flow <br />19,395 <br />13,325 <br />16,921 <br />11,338 <br />5,470 <br />15,268 <br />17 ,793 <br />17,497 <br />8,236 <br />16,261 <br /> <br />1:./ The report period .has been being changed to make it <br />coincide with the water year. <br /> <br />-2~. <br /> <br />> <br /> <br />, ~~--, <br /> <br />.. < ~."..c <br />