My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04745
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:25 PM
Creation date
10/12/2006 12:34:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
8/1/1996
Title
Animas-La Plata
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />;. <br /> <br />. <br /> <br />. <br /> <br />Animas-La Plata Project <br />Feature Fact Sheet <br /> <br />Phase I, Stage B <br /> <br />Reservoirs and Dams <br /> <br />Ridges Basin Dam & Reservoir -- Constructed in Phase I, Slage A <br />Southern Ute Diversion Dam <br />Type Concrete overflow spillway flanked by two compacted earth dikes <br />Length (feet) 100 <br /> <br />Pumping Plants <br /> <br />Durango Pumping Plant' <br />Ridges Basin Pumping Plant' <br />Red Mesa Pumping Plant <br /> <br />Pipelines, Canals, and Laterals <br /> <br />Ridges Basin Inlet Conduit <br />Durango M&I Pipeline <br />Shenandoah M&I Pipeline <br />La Plala Rural M&I Pipeline <br />Dry Side Canal (majority earth-lined, 0.9 mile <br />concrete-lined section) <br />Long Hollow Tunnel (I0.5-ft.-diam., concrete-lined) <br />Southern Ute Inlet Canal (concrete-lined) <br />Southern Ute Interim Irrigation Canal (earth-lined) <br />Laterals <br /> <br />Recreation Facilities <br /> <br />Maximum Capacity <br />lift (feet) ...Ms} <br />525 480 <br />900' 606 <br />214 77 <br />Length Capacity <br />(miles) ....(ill} <br /> <br />Constructed in Phase I, Slage A <br />Constructed in Phase I, Slage A <br />Constructed in Phase I, Slage A <br />Would not be constructed <br />25.6 700 to 370 <br /> <br />3.2 <br />2.6 <br />2.7 <br />109.6 <br /> <br />700 <br />375 <br />100 <br />Various <br /> <br />Ridges Basin Recreation Area - Would be constructed in Phase I, Slage A <br /> <br />, Additional pumps would be installed in Durango Pumping Plant during Phase I, Slage B. <br />3 The full size Ridges Basin Pumping Plant would be constructed during Phase I, Slage B. Pumps would <br />be installed to provide a Phase I, Slage B capacity of 606 cfs (600 cfs delivered to Dry Side Canal, 6 cfs <br />delivered to Shenandoah M&I Pipeline). <br />· Maximum lift to Dry Side Canal would be 330 feet; maximum lift to Shenandoah M&I Pipeline would be <br />930 feel By comparison, the Dolores Project lifts water 426 feet to irrigate lands along the South Canal. <br />The Central Arizona Project raises up to 3,000 cfs (6-500 cfs pumps) 800 feet. The pumps on the Southern <br />Nevada Water Project raise water up to 455 feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.