Laserfiche WebLink
<br /> <br />Table 1I-10.-Summary of Impacts ancl comparison of resource/lssues. continued <br /> <br />Resource <br /> <br />No Action <br /> <br />Threatened end <br />endengered species <br /> <br />No change from existing <br />trends. <br /> <br />Socioeconomic <br /> <br />Recreation <br /> <br />Reservoir recreation <br /> <br />No impacts. <br /> <br />Animas River <br />Commercial rafting <br />Private whllewater use <br /> <br />No change from existing <br />trends. <br /> <br />San Juan River raltlng <br /> <br />San Juan RIP would <br />lengthen season and <br />reduce some peaks. <br /> <br />Tourism <br /> <br />No change from existing <br />trends. <br /> <br />- <br />;;: <br />.... <br /> <br />Impacts' <br /> <br />Proposed Plan' <br /> <br />Phase I <br /> <br />1980 FES Plan <br /> <br />A <br /> <br />B <br /> <br />Phase II <br /> <br />Not analyzed with current <br />list. "No JeopardY- <br />opinion in 1979. <br /> <br />RPA will protect <br />endangered fish in <br />San Juan River. <br /> <br />Future consultation <br />needed. <br /> <br />Future consultation <br />needed. <br /> <br />loss 01 hunting and Increasecllmpacts at No additional Impacts from Same Impacts at Ridges <br />nature observation. Ridges Basin as a result Phase I, Stage A. Basin as for Phase I, <br />Economic benefits to of constructing at Stage A. Increased benelit <br />Southern Ute Indian Tribe maximum level of to Tribe as a result of <br />as result of operating development. Fishery constructing Southern Ute <br />Southern Ute Reservoir created In Ridges Basin Reservoir recreation <br />recreation facilities. Reservoir. faclllties to maximum level <br />Fisheries created In of development. Fishery <br />Ridges Basin and created In SOuthern Ute <br />Southem Ute Reservoirs. Reservoir. <br />-1 go!. of user days -3% of user days -18% of user days "tl <br />.19% of user days ~ <br />.5% to -7% of user days .1% of user days .5% to ..so;. of user days .5% to -8% of user days <br /> ~Ol <br />Similar to proposed Plan, Similar to No Action. Further reduced peaks. Same as Phase I, Stage B. <i~ <br />Phase 11. Impacts dependent on ~~ <br /> future ESA. ." <> <br /> <6 g. <br />+420,000 recreation days +331.000 recreation days +331.000 recreation days +512,000 recreation days Ol " <br />(reservoir) (reservoir) (reservoir) (reservoir) 0 II> <br />-1,881 commercial user -1,098 commercial user -6,005 commercial user -6,170 commercial user ~5. <br />days (river) days (river) days (river) days (river) g~ <br /> ~~ <br /> "ll .,. <br /> .,." <br /> " m <br />