My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04745
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:25 PM
Creation date
10/12/2006 12:34:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
8/1/1996
Title
Animas-La Plata
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Animas-La Plata Project <br />Feature Fact Sheet <br /> <br />Phase II (Total Project) <br /> <br />Reservoirs and Dams <br /> <br />Ridges Basin Dam & Reservoir - Constructed in Phase !, Stage A <br /> <br />Southern Ute Dam <br />Height above streambed (feet) <br />Crest Length (feet) <br /> <br />170 <br />2,900 <br /> <br />Southern Ute Reservoir <br />Capacity <br />Active Capacity (acre-feet) <br />Inactive and Dead Capacity (acre-feet) <br />Total Capacity (acre-feet) <br /> <br />40,000 <br />~ <br />70,000 <br /> <br />Surface Area (at top of active - elev. 6,076 feet) (in acres) <br /> <br />1,386 <br /> <br />Southern Ute Diversion Dam -- Constructed in Phase !, Stage B <br />La Plata Diversion Dam <br />Type <br />Length (feet) <br /> <br />Concrete overflow spillway flanked by two compacted earth dikes <br />50 <br /> <br />Pumping Plants <br /> <br />Maximum <br />lift (feell <br /> <br />Capacity <br />...Ms) <br /> <br />Durango Pumping Plant <br />Ridges Basin Pumping Plant' <br />Red Mesa l'umping Plant <br />Alkali Gulch Pumping Plant <br />Ute Mountain Pumping Plant <br />Southern Ute Pumping Plant <br />Third Terrace Pumping Plant <br /> <br />Constructed in Phase !, Stage A <br />900' 706 <br />Constructed in Phase !, Stage B <br />139 45 <br />170 56 <br />299 17 <br />140 30 <br /> <br />, The full-size Ridges Basin Pumping Plant would be constructed during Phase !, Stage B. Pumps would <br />be installed to provide a Phase!, Stage B capacity of606 cfs (600 cfs delivered to Dry Side Canal, 6 cfs <br />delivered to Shenandoah M&! Pipeline). <br />· Maximum lift to Dry Side Canal would be 330 feet; maximum lift to Shenandoah M&! Pipeline would be <br />930 feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.