My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04722
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04722
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:19 PM
Creation date
10/12/2006 12:32:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.A
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
3/4/1975
Author
Western Colorado Pro
Title
Dolores Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,eastern edge of the project area by McPhee Dam and Great Cut Dike. <br /> <br />Municipal and industrial storage for the town of Dove Creek would be <br />provid~d at the 690-acre-foot Monument Creek ReservoiI' located at an <br />offstream site in the Dove Creek area. <br /> <br />On the recommendation of the Fish and Wildlife Service, several measures <br /> <br /> <br />are planned for wildlife management. A reservoir is to be constructed <br /> <br /> <br />at Dawson Draw in the Montezuma Valley area for the enhancement of <br /> <br /> <br />waterfowl. This I'eservoir would also provide opportunities for fishing, <br /> <br /> <br />boating and picnicking. Also, an area near the existing Totten Lake <br /> <br />would be developed by construction of ~ikes to provide increased nesting <br /> <br /> <br />areas for waterfowl. Dawson Draw Reservoir and Totten Lake woUld I'e- <br /> <br /> <br />ceive a combined average of approximateiy 800 acre-feet of project <br /> <br /> <br />water annually from McPhee Reservoir through existing facilities. <br /> <br /> <br />PI'oject funds, would be provided for acquisition and improvement of <br /> <br /> <br />land north and ,east of the Dolores River for winter range to mitigate <br /> <br /> <br />big game hab:i. tat losses, caused by the project. <br /> <br /> <br />Project water would be distributed by a canal and lateral system con- <br /> <br /> <br />structed as part of the PI'oject. The Dove Creek Canal would be the <br /> <br /> <br />majoI' project canal. It would ,receive water pumped from McPhee Res- <br /> <br /> <br />ervoir at GI'eat Cut Dike by the Great Cut Pumping Plant and extend <br /> <br /> <br />about 39 miles northwest to Monument Creek ReservoiI'. OtheI' pI'oject <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.