Laserfiche WebLink
<br />>. <br /> <br />MEMORANDUM OF UNDERSTANDING <br />BETWEEN THE <br />UNITED STATES FISH AND WILDLIFE SERVICE <br />AND THE <br />COLORADO RIVER WATER CONSERVATION DISTRICT <br /> <br />I. BackQround <br /> <br />In January 1988. the Secretary of the Interior, the Governors of Colorado, <br />Wyoming, and Utah, and the Administrator of the Western Area Power <br />Administration entered into a Cooperative Agreement to implement the Recovery <br />Implementation Program for Endangered Fish Species in the Upper Colorado River <br />Basin (Recovery Program). The Cooperative Agreement also established an <br />Implementation COmmittee to oversee implementation of the Recovery Program by <br />the Fish and Wildlife Service (Service). The overall goal of the Recovery <br />Program is to recover and delist three endangered species (the Colorado <br />sQuawfish, h~ack chub, and bony tail chub) and to manage the razorback suck.er <br />so that it would not need the protection of the Endangered Species Act. (These <br />four fish are referred to as the rare Colorado River fishes in this Memorandum <br />of Understanding (MOU)). A principal element of the Recovery Program is a <br />process for coooucting Section 7 consultation in accordance with the Endangered <br />Species Act (ESA) on the impacts of water depletions to the rare Colorado River <br />fishes and for iCquiring water and/or water rights to provide instream flows <br />for the rare Colorado River fishes. Under the Recovery Program, the depletion <br />impacts of water development projects are offset by: (a) recovery activities <br />partially funded by water projects proponents' financial contribution to the <br />Recovery Progr~ (b) legal protection of instream flows according to State <br />law; and (cl progress in other recovery program elements which results in <br />protection of Mbitat or enhancement of the natural populations of the listed <br />species. Acconfingly, the Service has decided that it must determine that <br />progress under tile Recovery Program is sufficient to offset impacts of a <br />depletion project before it will issue a favorable Biological Opinion. In the <br />. Biological Opinion on the Muddy Creek. Project, the Service <br />concluded that progress under the Recovery Program had not been sufficient and <br />that an additiagl conservation measure was necessary to offset the depletion <br />impacts of the MUddy Creek Project. That additional conservation measure is <br />described in this MOU. <br /> <br />This MOU represeats a commitment to a process to provide flows for rare <br />Colorado River fishes in the reach of the main stem Colorado River from the <br />Grand Valley IMigation Company Diversion Dam to the confluence with the <br />Gunnison River 05-mile reach). These flows are being provided on an interim <br />basis until the Service determines that sufficient instream flows have been <br />acquired th~tbe Recovery Program to offset the impacts of the Muddy Creek <br />