Laserfiche WebLink
<br />. <br /> <br />" <br /> <br />14 <br /> <br />The third level of analysis is a simulation of the environmental baseline. <br />Work.ing frOll the present modified condition development scenario, the <br />environmental baseline was created by imposing the operational studies of <br />projects that have previously undergone Section 7 consultation, but are not yet <br />operating, in the existing condition baseline. Table 2 displays all projects <br />and depletions included in the environmental baseline for the Muddy Creek <br />project analysis. <br /> <br />The fourth level of analysis incorporates a net average annual depletion of <br />7.716 acre-feet attributable to the MUddy Creek project as described in the <br />Biological Assessment and supplemental data. The model was then reoperated to <br />create a new baseline flow condition which was utilized to evaluate flow changes <br />in the 15-mile reach, due to the Muddy Creek project. These data are displayed <br />in Table 3 with additional details on depletions and the extension of the record <br />presented in Appendix A. <br /> <br />Table 1 below compares the changes in flow at Cameo and the 15-mile reach. <br /> <br />TABLE 1. Changes in flow at Cameo and the 15-mi 1 e reach for the period of <br /> record 1952 to 1982. <br />---------------------------------------------------------------------------- <br /> COLORADO RIVER AT CAMEO * COLORADO RIVER AT PALISADE <br /> AVERAGE YEAR * AVERAGE YEAR <br /> KAF * KAF <br /> * <br /> ENV I RONHEITAl MUDOY CREEK * ENVIRONMENTAL MUDDY CREEK <br /> BASELINE CHANG E PROJECT * BASELINE CHANGE PROJECT <br />------------------------------ * ------------------------------ <br />JAH 91.0 0.1 91.1 * 93.0 0.1 93.1 <br />FEB 72.4 0.1 72.5 * 74.5 0.1 74.6 <br />MAR 80.1 0.1 80.2 * 79.7 0.1 79.8 <br />APR 148.0 -0.3 147.7 * 101. 8 -0.3 101.4 <br />MAY 362.8 -1.1 355.7 * 296.1 -7.1 289.0 <br />JUNE 555.3 -3.7 551.6 * 486.7 -3.7 483.0 <br />JULY 293.4 1.1 294.1 * 199.3 0.0 199.3 <br />AUG 156.2 1.4 157.7 * 62.0 0.0 62.0 <br />SEP 123.2 0.0 123.2 * 42.5 0.0 42.5 <br />OCT 125.5 0.2 125.7 * 63.1 0.2 63.2 <br />NOV 108.2 0.2 108.4 * 113.0 0.2 113.2 <br />DEe 96.6 0.2 96.8 * 100.0 0.2 100.2 <br />TOT 2212.8 -7.6 2205.2 * 1711. 5 -7.7 1703.8 <br />Values are subject to 1 plus or minus 1 KAF rounding error <br />KAF = Thousand acre-feet <br />