My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04701
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:13 PM
Creation date
10/12/2006 12:31:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Project
State
CO
Basin
South Platte
Water Division
1
Date
11/15/1981
Author
Ward Fischer
Title
Poudre Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />: , <br /> <br />all be presented as dollar amounts. Benefit streams and project <br />cost streams will be levelized and expressed in annual terms. <br />The end of a single iteration of the reconnaissance plan formu- <br />lation process will be a comparison of annual project costs and <br />benefits. It is anticipated that several iterations will be <br />performed for each candidate project in an attempt to select the <br />best plan. The CWCB will oe consulted about variations in the <br />candidate plan or plans in order to achieve resource development <br />objectives while formulating a project plan that is reasonable <br />and acceptable to the State. <br />If requested by the CWCB, a financial plan will be developed <br />for the project. This plan would assess the income likely to <br />result from alternative configurations and would identify sources <br />of financing and repayment plans for the project financing. The <br />markets for water and power would be assessed to determine the <br />users ability to pay for the project. The possibility of finan- <br />cing portions of the projeot with non-reimbursable Federal funds <br />would be investigated as part of this task. This task is con- <br />sidered optional and manpower requirements for this task are not <br />included in this proposal. <br /> <br />, <br />i , <br /> <br />PHASE V: REPORT PREPARATION <br />A draft report summarizing the results of the entire study <br />will be prepared and submitted to the CWCB for review. The in- <br />terim draft report, and all subsequent information, will be in- <br />corporated into the report. It is assumed that the CWCB will <br />require sixty days to review this report. After this review, <br />any comments from the CWCB will be incorporated into the final <br />report. <br /> <br />II-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.