Laserfiche WebLink
<br />6 <br /> <br />36 <br /> <br />35 <br /> <br />IA513 <br /> <br />35 <br /> <br />IA5ml <br /> <br />35 <br /> <br />IA6 <br /> <br />35 <br /> <br />IBl <br /> <br />ill 1 <br /> <br />IIA3e <br /> <br />36,37 IIAI-6 <br /> <br />>*37 IIBlb3 <br /> <br />>*37 IIB3a2 <br /> <br />00\)771 <br /> <br />, a number of sources that can be used to provide the west slope's <br />commitment of5,412,5 AF, West slope water users have not identified a <br />pemlanent source, In the event a permanent source is not provided by <br />2008, the River District will request an extension of its agreement under <br />the Colorado River programmatic biological opinion, and will provide <br />water from other sources until a permanent source is identified, developed, <br />and dedicated to this purpose, The Colorado Water Conservation Board <br />has been requested to include a new reservoir for providing all Ruedi <br />replacement water in the Statewide Water Supply Initiative, a major water <br />supply planning study scheduled for completion in 2004, <br /> <br />! Checks are in place for Grand Valley Water Management project; they <br />are fully automated, and the Highline pumping plant will be completed in <br />2004, <br /> <br />! Coordinated Facilities Study was completed in September 2003, <br />Executive Committee's recommendations adopted by Implementation <br />Committee and will be pursued dependent on water availability, <br /> <br />! Review ofRJPRAP and comparison with PBO schedules completed in <br />FY 2003 (in concert with RJPRAP assessment), <br /> <br />! Flow recommendations (Gunnison & Colorado) report approved by <br />Biology Committee on May 15, 2003, <br /> <br />Service needs to determine if combination of Colorado and Green River <br />flows above the confluence are adequate for recovery, <br /> <br />! Hamilton's Walter Walker selenium remediation report complete in <br />2003, <br /> <br />! Floodplain acquisition and levee removal strategy are complete and <br />operation, maintenance, and evaluation of sites is being incorporated into <br />Colorado River sub-basin floodplain management plan, <br /> <br />! X Due to operational problems, the GVIC screen was not operated in the <br />2003 irrigation season, Native and endangered fish were retrieved from <br />canal by USFWS in November 2003, The hydraulic model was <br />completed, 3-phase power service installed, and a larger capacity air <br />compressor and generator procured, Modifications to the screen and <br />installation of deflector wall should be completed by March 2004 in time <br />to allow operation throughout the 2004 irrigation season, <br /> <br />! X Construction of off-ramp for Govenunent Highline fish passage began <br />in 2003, (Completion date moved out from 4/05 to 8/05, however), <br /> <br />2003 RlPRAP Assessment - Page 6 <br />